473798
40
Zoom out
Zoom in
Previous page
1/132
Next page
Protect PV.500 Operating Instructions
36 of 70 80000031354 BAL
5.4 MPP Tracker
In the "Operation" status (see chapter 5.1.3), the inverter detects
the maximum power point (MPP) of the PV cells.
The MPP tracker detects the point at which the solar cells give off
maximum power.
This enables the equipment to achieve optimum efficiency.
Figure 9 MPP performance curve
5.5 Compain Operation
In "compain operation", the efficiency of a system with two
inverters can be increased by connecting the two PV panels at
less than full power.
If insolation levels fall, the PV cells are connected and only one
inverter is in operation.
If insolation levels rise, the connection is terminated. Now both
inverters are in operation. Each inverter is supplied with power by
its associated PV panel.
5.5.1 Linked Operation
One inverter is switched on and is feeding power into the mains.
The other inverter is logically switched off. The tie switch is closed.
The inverter which is active in linked operation changes daily.
This operating mode is active when insolation levels are low.
Figure 10 Linked operation in compain operating mode
40


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for AEG Protect PV 500 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of AEG Protect PV 500 in the language / languages: English as an attachment in your email.

The manual is 1,99 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of AEG Protect PV 500

AEG Protect PV 500 User Manual - German - 136 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info