Protect PV.250 Operating Instructions
Page 19 of 51 80000027023 BAL, en
Fig. 7 MPP performance curve
4.5 Partner Operation
In "partner operation", the efficiency of a system with two inverters
can be increased by connecting the two PV cells at less than full power.
If insolation levels fall, the PV cells are connected and only one in-
verter is in operation.
If insolation levels rise, the connection is terminated. Now both in-
verters are in operation. Each inverter is supplied with power by its
associated PV cell.
4.5.1 Linked Operation
One inverter is switched on and is feeding power into the mains.
The other inverter is logically switched off. The tie switch is closed.
The inverter which is active in linked operation changes daily.
This operating mode is active when insolation levels are low.
Fig. 8 Linked operation in partner operating mode
Change of status to single operation:
If capacity utilisation in the inverter which is switched on rises
above a certain value, once a delay has elapsed, the two inverters
are switched to single operation.
First, the inverter which is switched on is switched off. Then, the tie
switch is opened. Once the tie switch is open, both inverters are
switched on.
Change of status to linked operation in the event of a fault:
In the event of a deactivating or self-acknowledging fault in the in-
verter which is switched on, the two inverters are switched to
linked operation.
The inverter which is switched off is switched on. The faulty in-
verter is shut down due to the fault.
19


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for AEG Protect PV 250 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of AEG Protect PV 250 in the language / languages: English as an attachment in your email.

The manual is 0,63 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of AEG Protect PV 250

AEG Protect PV 250 User Manual - German - 52 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info