540488
9
Zoom out
Zoom in
Previous page
1/84
Next page
2-3
IM 1F5B2-01E
2. HANDLING PRECAUTIONS
Pipe support
ULTRA YEWFLO
Pipeline
Figure 2.4 Example of Pipe Support
Other Considerations
Choose a location where there is sufficient clearance around ULTRA YEWFLO to
allow such work as routine inspections.
Choose a location that ensures easy wiring and piping.
It will be to your advantage if you equip the installation location with lighting for
night-time maintenance and inspections, power outlets for measuring instruments and
wired phone jacks for contact with the supervisory control room.
2.5 Precautions Regarding Pipelines
When turning on a process fluid through a pipeline, observe the following instructions to
use ULTRA YEWFLO to the intended degree of safety.
Make sure the bolts that fasten ULTRA YEWFLO and the pipeline together are
securely tightened.
Make sure no fluid is leaking from the pipeline.
Do not apply a pressure exceeding the specified limit.
ULTRA YEWFLO is under constant pressure while a process fluid is flowing. Do
NOT loosen the bolts that fasten the flanges. If you loosen the bolts, there is a risk of
the process fluid gushing out of the pipeline.
If the process fluid is toxic or otherwise harmful to personnel, exercise extreme care
to prevent the fluid from coming into contact with the eyes or skin and to avoid
inhaling any released gas.
WARNING
9


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Yokogawa UYFA21 Ultrasonic Vortex Flowmeter at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Yokogawa UYFA21 Ultrasonic Vortex Flowmeter in the language / languages: English as an attachment in your email.

The manual is 0,93 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info