638626
4
Zoom out
Zoom in
Previous page
1/33
Next page
PYROGAS VARINO 65 - 300
We reserve the right to make changes to dimensions and construction 2 Edition 02.09.2015
© Copyright YGNIS AG CH-Ruswil
1. Precautions
STEPS TO BE TAKEN IN CASE OF DANGER
Close fuel supply, disconnect unit from mains using emergency stop or main switch (outside of the boiler room).
Use suitable fire extinguishers to extinguish flames.
Occurrence of gas smell
- Ventilate the affected rooms thoroughly by opening doors and windows.
- Do not use any electronic devices (mobile phone, etc.).
- Do not activate any electrical contacts (light, motor, lift, door bell, etc.).
- Do not ignite matches or lighters, and do not smoke.
- Call the gas board or heating engineer.
PACKAGING
After removing all packaging materials, check the contents to
make sure that no damage has occurred during shipping.
When in doubt, do not use the apparatus and contact the
supplier.
The packaging materials are to be disposed of properly.
THE BOILER UNIT
Smooth boiler performance and manufacturer’s guarantee are
dependent upon adherence to the boiler installation, operation
and maintenance instructions contained in this booklet.
Never permit children or unauthorized persons to tamper with
the equipment.
The unit must be used only for its expressed application. All
other uses are considered dangerous.
The burner's minimum and maximum delivery settings, all
pressures and temperatures must all be contained in the
range stipulated in this manual.
Modification of the equipment in order to alter its performance
or applicationis prohibited.
Do not open or tamper with components of the unit other than
those parts of the unit that are subject to maintenance
operations.
Never touch the hot parts of the unit; these parts (flue gas
conduit, sight glass, burner parts, etc) may remain hot for
quite some time after the burner has switched off.
Never touch the unit with wet parts of the body or without
wearing shoes.
When the unit is not to be used for a longer period, the main
power switch on the electrical control panel must be switched
off and the manual valve on the unit fuel supply line must be
closed.
The device contains components made of synthetic silicon
mineral fibres (glass fibres, insulation wool). These
components must be disposed of appropriately at the end of
their life cycle. Local regulations must be observed.
INSTALLATION AND SETTINGS
The installation and calibration of the unit must be performed
exclusively by qualified personnel in conformity with existing
regulations and the indications provided in this Manual.
THE BOILER ROOM
The boiler room must be lockable and it's external air openings
must conform to the norms prevailing locally. When in doubt
regarding air circulation, register the blower speed with the
burner operating at its maximum delivery and the room
ventilated only by the burner ventilation air openings and a
second time with the door open. The blower speed registered
in both cases must not differ. Should there be more than one
unit in the same room, this test must be performed with all the
equipment operating simultaneously.
Never obstruct the boiler room's air openings, the burner fan
suction opening, and any air ducts and ventilation.
The equipment must always be protected against rain, snow,
and freezing conditions.
The boiler room must be kept clean and free of volatile
substances that may be sucked into the fan and clog the inner
burner or combustion head.
The combustion air must be free of halogens (chlorine and
fluorine compounds). The presence of halogen in the
combustion air leads to great corrosion damage. If there is any
doubt, the perfect quality of the combustion air must be
ensured with an external air intake.
ELECTRICAL INSTALLATION
Electrical connections must be made exclusively by qualified
personnel and all prevailing electrical regulations must be
scrupulously observed.
Make sure that the electrical power supply used for connection
conforms to the specifications indicated on the rating plate and
in this manual.
The unit must be correctly connected to an efficient ground
system in conformity to the prevailing norms and checked and
controlled for efficiency by qualified personnel when in doubt.
Never confuse neutral wires with phase wires.
The unit must be hooked up to the electrical network with a
plug-socket connection that is such as to prevent inversion of
phase and neutral. Install a master switch for the heating plant
as requested by existing legislation.
The entire electrical system, and all cable sections in
particular, must be adequate to deliver the maximum absorbed
power value indicated in this manual.
If the mains power cable is found to be defective, it must be
replaced only by qualified personnel.
Never stretch power supply cables and keep them well away
from sources of heat.
FUEL
The unit must be fed with the type of fuel for which it has been
preset as indicated on the rating plate.
The fuel pressure must be according to the values listed in this
manual.
The fuel line that feeds the unit must be sized according to the
requirements of local regulations. The line must be perfectly
sealed. The fuel supply line must also be equipped with all the
control and safety mechanisms required by local regulations in
force. The line must be free from all impurities; take particular
care that foreign matter does not enter the line during
installation.
The gas line must be checked for leakage during
commissioning and after each disconnection.
MALFUNCTION
If the unit stops working and goes into lock-out and does not
resume operation after two or three manual lock-out reset
attempts, do not attempt to repair, and contact a qualified
specialist.
All repairs required must be performed exclusively at a
technical servicing centre authorized by the manufacturer
using original spare parts only. Failure to observe the above
may compromise the reliability and safety of the equipment.
Any failure or damage resulting from improper use or
intentional damage will relieve the manufacturer from any
guarantee obligation.
MAINTENANCE
Maintenance must be performed by qualified personnel
regularly or at least once a year.
Prior to performing any maintenance operations, switch off the
power supply by using the main switch and cut off the fuel
supply as well.
Only parts indicated by the manufacturer in the Spare Parts
Catalogue may be replaced.
In order to avoid all types of health hazards, suitable clothing
and a protective mask must be worn for work on or with
components made of synthetic silicon mineral fibres (glass
fibres, insulation wool).
4


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Ygnis Varino at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Ygnis Varino in the language / languages: English as an attachment in your email.

The manual is 1,05 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Ygnis Varino

Ygnis Varino Usermanual and installation guide - German - 30 pages

Ygnis Varino Usermanual and installation guide - Dutch - 30 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info