638656
43
Zoom out
Zoom in
Previous page
1/48
Next page
LR, LRK, LR-NT, LRK-NT 21 - 32
We reserve the right to make changes to dimensions and construction 41 edition 30.10.2007
© Copyright YGNIS AG CH-Ruswil
8.3. First steps to take in case of failure
In the event of system operational failure, perform the checks in the table below. Also check the governor set-up.
If the failure cannot be eliminated, call a reliable engineer or your support service.
Problem Possible cause Solution
Burner not functioning No power Check fuse, switch on main or safety
switch. Connect supply and burner plug
Burner LED is on Press burner reset button
No oil
Gas pressure insufficient
Add oil
Call the gas board
Overheat temperature LED is on.
Safety thermostat has come into
operation
Fix the cause, wait until temperature has
dropped below overheat setpoint then
reset the safety thermostat by pushing
the pin
External default LED is on. Fix the cause
Heating elements fail to heat up Incorrect operation type setting on
governor
Set up type of operation and heating
programme
Circulation pump blocked Remove locking screw, turn shaft until
no more resistance is left
Water level or system pressure Top up and ventilate
Shut-off elements on supply and
return lines closed
Open them
43


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Ygnis Pyronox LRK-NT at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Ygnis Pyronox LRK-NT in the language / languages: English as an attachment in your email.

The manual is 1,29 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Ygnis Pyronox LRK-NT

Ygnis Pyronox LRK-NT Usermanual and installation guide - Dutch - 46 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info