Installation
6720813171 (2016/05)16
Install the gas valve connector 1" [1] (accessory).
Install the gas valve [2] onto the gas pipe. Use a gas valve with a
minimum diameter of 1".
Fig. 14 Making the gas connection
[1] Gas valve connector 1"
[2] Gas valve 1"
Connect the main gas pipe to the gas connection making sure it is not
under stress. Use a gas pipe of at least Ø 22 mm.
Make the gas connection according to the country-specific standards
and regulations.
Carry out gas leak test on gas connection using leak detection spray
and purged as described in IGE/UP/1b.
Installing the heating flow and return pipe
The central heating system should be installed in accordance with
BS 6798 and, in addition, for small bore and micro bore systems,
BS 5449 or EN 12823.
Connect the flow pipe with a flat rubber seal installed to the CHF
(CH boiler flow) connection [1] making sure it is not under stress.
Use a flow pipe with a minimum diameter of 1½".
Connect the return pipe with a flat rubber seal installed to the CHR
(CH boiler return) connection [2] making sure it is not under stress.
Use a return pipe with a minimum diameter of 1½".
Fig. 15 Connecting the boiler flow and return
[1] CH boiler flow
[2] CH boiler return
[3] Isolating valves
[4] Drain cock
[5] Gas valve
[6] Pressure relief valve
[7] Condensate trap
[8] Pump
[9] Non-return valve
[10] Dirt filter
8.2.4 Installing the differential pressure controller
In situations where there is no low loss header, installing a bypass with a
differential pressure controller would not be required.
If a low loss header is present, it may be required -depending on the
situation - to install a bypass with a differential pressure controller to the
secondary side of the low loss header. This serves to protect the
secondary pump against overheating as a result of insufficient flow.
8.2.5 Installing the isolating valves
Install a isolating valve for maintenance and repair purposes in both
the boiler flow and return circuits ( fig. 15, [3]). Use isolating
valves with a minimum diameter of 1½".
8.2.6 Installing the drain cock
Connect a drain cock in the return circuit ( fig. 15, [4]).
8.2.7 Installing a pressure relief valve
Install a 4-bar pressure relief valve ( fig. 15, [6]) with a minimum
passage of 22 mm in the flow circuit. Make sure that the pressure
relief valve is always installed between the boiler and the isolating
valve, so that the boiler will always be in contact with the pressure
relief valve, even if the isolating valves are closed.
8.2.8 Selecting and installing the pump
Select a pump according to the hydraulic boiler resistance specified
in table 5 or in the curve in fig. 122 on page 62.
When using the curve take the nominal required volume flow into
consideration according to table 3.
When selecting the pump, take the maximum volume flow of the
boiler according to table 4 into consideration.
When using plastic pipes, observe the supplier’s
instructions - especially those referring to
recommended jointing techniques and the notes relating
to the heating system water on page 6
NOTICE:
To prevent contamination in the heating system we
recommend you to integrate a dirt filter [10] in the
return pipe, near the boiler. In an old system it is a
requirement to install a dirt filter.
Install shut-off valves to enable filter cleaning
immediately upstream and downstream of the dirt
filter.
2
G1”
R1”
6 720 648 726-014.1TD
1
CAUTION: Damage to the installation.
The pressure in the heating system can become
excessively high.
Install a pressure relief valve.
10
3 3
6 720 648 726-015.1TD
7
4
1
6
3
5
3
8
9
2
16


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Worcester-Bosch GB162-80 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Worcester-Bosch GB162-80 in the language / languages: English as an attachment in your email.

The manual is 5,43 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Worcester-Bosch GB162-80

Worcester-Bosch GB162-80 Installation Guide - English - 12 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info