697434
10
Zoom out
Zoom in
Previous page
1/72
Next page
Safety
6720813171 (2016/05)10
4Safety
Please observe these instructions for your own safety.
4.1 Please observe these instructions
Observe the following instructions when installing and operating the
heating system:
The local building regulations as regards the installation conditions.
The local building regulations as regards fresh air supply and air
exhaust facilities and flue connections.
The regulations for electrical connections to the power supply.
The gas utility company rules for connecting the gas burner to the
local gas mains.
The regulations and standards concerning the safety facilities for the
DHW/heating system.
The installation instructions for producers of heating systems.
The condensing gas boiler may only be used with the combustion air/
flue gas systems designed and approved specifically for this type of
boiler.
Note: in certain areas permits are required for the flue gas system
and for connecting the condensate water drain to the public sewage
network.
4.2 Tools, materials and further equipment
Boiler installation and maintenance requires standard tools for heating,
gas and water installation.
In addition you will need a hand truck/cart with a securing strap.
4.3 Recycling
Dispose of the boiler's packaging material in an environmentally
friendly manner.
Dispose of those components of the heating installation (e. g. boiler
or controller) which have to be replaced in an environmentally
friendly manner by handing them in at an authorised recycling
facility.
5 Transport
This chapter describes how to transport the boiler safely and without
damaging it.
Fig. 2 Open cover panel
5.1 Lifting and carrying the boiler
To lift and carry the boiler, place one hand at the bottom of the boiler and
the other hand on its front ( fig. 3).
DANGER:
Danger of fatal accident from explosive fumes. If you
smell gas, there is a danger of explosion.
No naked lights. No smoking. Do not use lighters.
DO NOT operate any device that is likely to produce
sparks. Do not operate any electrical switches,
including telephones, plugs or doorbells.
Shut off the main gas supply.
Open doors and windows.
Warn the residents but do not ring doorbells.
Contact the gas utility company from a telephone
located outside the building.
If you can hear gas leaking out, evacuate the building
immediately, prevent other persons from entering,
and notify the police and fire service immediately
(from a telephone outside the building).
DANGER:
Danger of fatal accident from explosive fumes.
Only carry out work on gas pipes and fittings if you
are Gas Safe / ACS registered.
DANGER:
Danger of fatal accident due to poisoning. Dangerous
flue gas can escape if the air supply is insufficient.
Make sure that air vents are not reduced in size or
obstructed.
The boiler may only be operated after the defect has
been remedied.
Warn the user of the system of the defect verbally
and in writing.
CAUTION: Damage to the installation due to impacts.
The boiler contains parts which can be damaged by
impacts.
During further transport all parts must be protected
against impacts.
Observe the transport symbols and instructions on
the packaging.
CAUTION: Damage to the installation due to external
contamination.
Proceed as follows if the boiler has been unpacked but is
not put into operation yet:
Protect the boiler connections against pollution by
leaving the protective covers on the connections.
Cover the flue gas injectors at the top of the boiler
with plastic film.
CAUTION: Damage to the unit due to it being lifted and
carried incorrectly.
Do not hold the boiler by the door over the control
panel ( fig. 4) to lift and carry it.
6 720 648 727-010.1TD
10


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Worcester-Bosch GB162-80 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Worcester-Bosch GB162-80 in the language / languages: English as an attachment in your email.

The manual is 5,43 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Worcester-Bosch GB162-80

Worcester-Bosch GB162-80 Installation Guide - English - 12 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info