802135
8
Zoom out
Zoom in
Previous page
1/158
Next page
5 | Installation instructions
8 / 158 9039409D_OI-II_Cool Top Trail 34
5.7 CI-BUS Cable(s)
NOTE
This chapter is only applicable if the Cool Top Trail 34
indoor unit is equipped with a CI-BUS Unit and this CI-
BUS Unit must be connected to an external CI-BUS sys-
tem.
To assemble the CI-BUS cables, follow the instructions in
chapter5.7.1, "CI-BUS cable assembly" on page 8.
Use the appropriate CI-BUS cable to connect the CI-BUS Unit to
the CI-BUS system.
If two Cool Top Trail air conditioners are installed, use the
CI-BUS interconnection cable to connect the CI-BUS Units.
WARNING
Danger of electrocution
You must make sure that there is no voltage at electric-
ally operated components before working on them.
Make sure that the mains power supply or the power
supplied by inverters is isolated.
Fig.12 CI-BUS cable
NOTE
Malfunctioning of the CI-BUS
Do not lay mains cables, the CI-BUS cable(s) and
12/24V cables together in the same cable duct.
1. Optionally lead the CI-BUS cable through the roof insula-
tion as shown above.
2. Drill a hole in the wooden bar through which to route the
CI-BUS cable.
3. Route the CI-BUS cable through the hole in the wooden bar
before mounting the bar.
4. Attach and lay the cables so that they cannot be tripped
over or damaged.
5. Use cable ducts to route cables through walls with sharp
edges.
6. Do not lay loose or bent cables next to electrically conduct-
ive material (metal).
7. Route the CI-BUS cable to the indoor area of the caravan,
vehicle or motorhome.
8. Route the CI-BUS cable to the Cool Top trail air conditioner.
9. In case of two Cool Top Trail air conditioners route a CI-
BUS interconnection cable between the two CI-BUS Units.
5.7.1 CI-BUS cable assembly
The CI-BUS cables must be assembled with appropriate crimp
terminals and a matching housing. See chapter4, "Required
connectors for the CI-BUS" on page 5 for specification details.
Always adhere to the manufacturer's guidelines.
1 2 3
Fig.13 CI-BUS cable assembly
1 Cable
2 Crimp terminals
3 Housing
1 2 3 4 5
Fig.14 CI-BUS interconnection cable assembly between two CI-BUS
Units
1 Housing CI-BUS (CI-BUS Unit 1)
2 Crimp terminals CI-BUS (CI-BUS Unit 1)
3 Cable
4 Crimp terminals CI-BUS (CI-BUS Unit 2)
5 Housing CI-BUS (CI-BUS Unit 2)
5.8 Adaptor frame installation
1. Make sure the roof is clean, dry and free from oil or grease.
2. Insert the adapter frame into the cut-out to make sure that
the power supply cable and the CI-BUS cable (if applicable)
do not interfere with the frame. If the cables cause obstruc-
tions, then cut or drill openings in the bottom of the frame
to lead the cables through.
3. Confirm the correct orientation of the frame by using the
“This side up” label.
Fig.15 Orientation of the adaptor frame
4. Turn the part over and on the reverse side of “This side up”,
apply silicone sealant uniformly over the path shown.
Fig.16 Sealant paths
5. Turn the part over again and make sure “This side up” is
up. Press down firmly over the installation hole and remove
any sealant that has squeezed out.
8


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Webasto Cool Top Trail 34 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Webasto Cool Top Trail 34 in the language / languages: English, German, Dutch, French, Italian, Swedish, Spanish as an attachment in your email.

The manual is 12.38 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info