661549
17
Zoom out
Zoom in
Previous page
1/80
Next page
Battery charger / inverter COMBI-GAMMA
090138.02 17
2. Power Control Mode:
When AC IN power is ready, INVERTER is active and battery is about to be exhausted, •
battery voltage is lower than B2-10 voltage value and longer than the second time set
in B2-11, ATS will be switched on to ensure AC OUT to continuously the load. At the
moment, AC OUT will be supplied by AC IN power. At the same time, the power control
mode is active and will supply the extra AC IN power to charge the battery!
(INVERTER OFF + ATS ON + AC CHARGER ON + Power Control Mode ON)
Battery
Shore Power
Load
ATS ON
AC IN
AC OUT
2A
5A
B2-05=5A
3A
30A
Solar
Charger
Solar Panel
or
5A
3. Load Support Mode
And now the other load adds and the current increases to 11A. This is where Load Sup-•
port function is needed!
(ATS ON + AC CHARGER OFF + INVERTER ON + Load Support Mode ON)
As soon as the load reduces to less than 5A, any current that is left over will be used to •
recharge the battery.
Battery
Shore Power
Load
ATS ON
AC IN
AC OUT
6A
5A
B2-05=5A
11A
90A
Solar
Charger
Solar Panel
or
5A
17


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Vetus COMBI3024 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Vetus COMBI3024 in the language / languages: English as an attachment in your email.

The manual is 4,72 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Vetus COMBI3024

Vetus COMBI3024 Usermanual and installation guide - Dutch - 80 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info