652329
29
Zoom out
Zoom in
Previous page
1/32
Next page
29
Detail 1:
Fit the brush handle extension
onto the turbulator remover
Withdraw the pin from turbulator.
Detail 2:
Fit the pin in the radial hole with a hammer.
Detail 3:
Screw the turbulator remover onto the
turbulator.
Detail 4:
Turn up to unblock the turbulator.
Detail 5:
Withdraw the turbulator
Detail 6:
Turn the remover counterclockwise to
release the turbulator
The procedure from detail 3 to 6 has to be repeated for all the turbulators.
Turbulators removal
4.2 - PRELIMINARY CHECK
Once all the hydraulic, electrical and fuel
connections have been made, before starting
the boiler we suggest to ascertain that:
- The expansion vessel and the pressure
relief valve are correctly connected and
are in no way interceptable.
- The bulb of thermometer, working, high
limit and minimum thermostats are well
secured into their proper bulb holder.
- The turbulators are correctly fitted in all
the smoke pipes.
- The C.H. circuit has been washed and
rinsed and is free from solid impurities.
- The C.H. circuit is filled with water and
has been completely purged.
- The pumps operate properly.
- The flow switch, the pressure relief valve,
and the overheating discharge valve, if
any, are adjusted at the right value.
- The fuel, hydraulic, electrical and safety
connections are executed in conformity
with national and local requirements in
force.
- There are no water leaks.
- The burner has been fitted according to
the instructions of the burner
manufacturer.
- The mains voltage and frequency are
compatible with the burner and the
electrical equipment of the boiler.
- The burner is adjusted for the fuel type,
among those listed in the burner data plate,
available on the installation site, and the
burner output range is compatible with the
boiler output.
- In the boiler house there are also the burner
instructions.
- The C.H. pipes are properly insulated.
- The C.H. system is capable to absorb the
heat quantity produced at the first start of
the burner, during the test period.
- The shunt pump is installed as
prescribed in the paragraph 2.5.6.
4.3 - FIRST COMMISSIONING
At the commissioning stage of the boiler a
qualified technician has to perform the
following checks:
- Internal and external sound test of burner
and fuel feeding pipe;
- Adjustment of the fuel throughput according
to the nominal input of the boiler (it is
convenient to remember that the nominal
input can be adjusted between the minimum
and the maximum shown in the table of
pages 5 to 8), by sharing the output between
the 1st and the 2nd stage, knowing that
the 1st stage flame can go down to the
60% of the nominal output (which at its
turn can vary between the minimum and
the maximum depending on the output
requested by the C.H. system).
Proceed, then, in the following way:
- Open the fuel feeding cock and check that
there are no leaks in the feeding line.
- Ascertain that all the switches of the
panel board are in OFF position and adjust
the working thermostat to the
minimum position.
- Switch ON the panel board through the
main switch.
- Switch ON the C.H. pump: it will start to
rotate as soon as the minimum water
temperature thermostat detects 50°C.
- Switch the burner ON.
- Position the working thermostats of 1st
and 2nd stages to the maximum setting
to create a heat request.
During this phase check that:
- There are no smoke leaks from the front
door, the burner plate and the chimney
connection.
- There is a draught at the chimney base
between 2 and 4 mm w.g.
- There are no water leaks.
- The different thermostats and the other
installation safety devices work properly.
- The shunt pump operates correctly.
- The burner ignition is good.
- The burner characteristics (main
adjustments and nozzle type) correspond
to the boiler data plate.
With a burner properly adjusted it must be
possible to reach easily, from a smoke sample
taken at the chimney base, the values given
below:
1) With light oil having a maximum viscosity
of 1.5 °E at 20 °C:
- CO = 12 to 13 %
- Smoke index < 1
- Smoke temperature = 190 to 210 °C
2) With Natural Gas:
- CO = 9 to 10 %
- Smoke temperature = 180 to 200 °C
(values related to a clean boiler, with water
at 70 °C).
It is suggested to adjust the fuel throughput
to the actual needs of the C.H. installation
(avoid to overcharge the boiler), without
exceeding the a.m. smoke temperatures
(never go below 160 °C).
fig. 34
29


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Unical Ellprex at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Unical Ellprex in the language / languages: English as an attachment in your email.

The manual is 0,75 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info