680845
8
Zoom out
Zoom in
Previous page
1/20
Next page
6
7
4”- 6” ELECTROSUBMERSIBLE PUMPS
Standard use
Well
arthesian depth DN100 mm (4”)
DN 150 mm ( 6”)
Liquid
clean water or lightly charged,
max. temperature 25ºc; sand
content 40 g/m
3
Service
continuos or intermittent max.20
starts/hour well distributed. Max.
voltage drop 3% on nominal data
voltage
Motor
4- 6” imerged, asychronous
bipolar,water cooled (flow 0,1
m/s), insulation B cl.(4) and
F(6),degree of protection IP
58.THREEPHASE with direct
star t (0,25/5,5kW)o star t-
delta or statoric start(>5,5kW);
SINGLEPHASE with capacitor
tart (0,25/2,2kW). To be coupled
according to NEMA standars.
FIRST CONTROL
• The well must be right,without sand or
sediment,if not provide to bleed it.
• Before plunging the group check the sense
of rotation of the motor: it must anticlockwise
looking from the shaft exit side. For water
cooled motors also control the topping-up the
liquid according to the motor manufacturer’s
instructions.
MOTOR COUPLING
• Check the free rotation of the motor-pump
and the cable condition, if not tted, block the
connector into its seat with a proper key (5
kgm). Clean the surfaces to be coupled.
• Keep out the suction screen and cable pro-
tection, put the suction head of the pump in
correspondance of the motor prisoners and
cable cross;couple the grooved joint of the
pump to the motor shaft then x it with nuts
as standard.
• Make sure that a clearance exists on pump
joint by using a screw-driver appealing to the
motor,reassemble the suction screen and
cable protection and insert the motor cable in
its own seat.
CABLE
CONNECTION
• Joint the motor cable to the line cable (10) with
high insulating systems(thermotightening or
dielectric resin).
• Choose the standart feeder(2) according
to: voltage-power-lenght-type of service
(insulation>1kW)
• When nishing the cable connection,before
pluging the electropump,verify the followings
by using suitable instruments:the CONTI-
NUITY among phases,between the earth
conductor and motor mass,the INSULATION
between phases and earth.
INSTALLATION
• Handle thee pump (12) carefully;don’t hurt it
and dont make it fall.Apply safety and accident
prevention rules in force in the building yards
when screwing pipings(9) and getting down
the group. Be careful to void overturnigs that
could hurt persons and plants.
Tighten the threads of the discharge pipings;
for safety purposes it is better to execute some
spot-weldings at the coupling level. With plastic
pipings use proper connections.
• Anchor the group with resistant,antioxidant
cables (8), suitable to bear the weight of the
machine with discharge pipings full of water.
• When getting down the pump,link the electrc
cables to the discharghe piping, x them with
plastic hose clamps(each 3mt),be careful: don’t
damege them and NEVER use them to uphold
the goup.
• If the diameter of the well is quite bigger than
the electropump, it is better to install another
jacket,external to the motor; this is to grant that
the cooling water speed is ≥0,1 m/s.
• Place the electropump keeping it away from
the bottom of the well (x); this is ti avoid a bad
cooling due to sediments; the dinamic level(A)
of the well must not inuence its work. Grant
electrical protections and automatic level con-
trols (3) to the installation.
• Always install, at least, one non-return valve (6)
at the surface to protect the pump against wa-
ter hammers due to the plant before the valve.
8


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Speroni SX at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Speroni SX in the language / languages: English, French, Italian, Spanish as an attachment in your email.

The manual is 8,33 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info