The specified percentages are variables, which may deviate more or less strongly depending on the system, pump
and pump level. 100% is the maximum possible power of the controller.
Setpoint
This value is the control setpoint. If this value is below at the sensor, the speed is reduced. When it is exceeded, the speed is
increased.
Ignition time
To optimize the speed control in consideration to setpoint and boiler sensor S1 during the ignition time the ignition time can be
set here. The difference between Tmin S1 and the Setpoint see " Setpoint " on page 17. Is evenly distribiuted between the time
set here. The setpoint value is increased during the ignition time from Tmin S1 to the setpoint.
Time & Date
Serve to set the current time and date.
For system data statistics it is essential for the time to be set accurately on the controller. Please note that the clock
continues to run for about 24 hours if the mains voltage is interrupted, and afterward must be reset. Improper oper-
ation or an incorrect time may result in data being cleared, recorded incorrectly or overwritten. The manufacturer
accepts no liability for the recorded data!
Sensor Calibration
Deviations in the temperature values displayed, for example. due to cables which are too long or sensors which are not posi-
tioned optimally can be compensated for manually here. The settings can be made for each individual sensor in steps of 0.5 °C.
Settings are only necessary in special cases at the time of initial commissioning by the specialist. Incorrect meas-
urement values can lead to unpredictable errors.
Commissioning
Starting commissioning help guides you in the correct order through the basic settings necessary for commissioning, and
provides brief descriptions of each parameter in the display. Pressing the esc‘ key takes you back to the previous value so you
can look at the selected setting again or adjust it if desired. Pressing ‚esc‘ more than once takes you back to the selection mode,
thus cancelling the commissioning help see " Commissioning help " on page 11
May only be started by a specialist during commissioning! Observe the explanations for the individual parameters in
these instructions, and check whether further settings are necessary for your application.
Factory Settings
All settings can be reset, returning the controller to its delivery state.
All of the controller‘s parametrization, statistics, etc. will be lost irrevocably. The controller must then be commissioned
once again.
Heat quantity
If heat quantity metering is activated the approximate heat from the manually entered values of the flow from the system and the
measured sensor values from the solid fuel boiler and storage are calculated. Additional inputs for the flow of the system are
necessary. Additionally through the setting offset ∆T, a correction factor can be set for the heat quantity collection. Since the solid
fuel boiler temperature and the storage temperature can be used for the heat quantity metering, depending on the system, there
may be deviations from the displayed solid fuel boiler temperature to the actual previous temperature or the displayed storage
temperature to the actual return temperature. Through the setting Offset ∆T, this deviation can be corrected.
Example: displayed collector temperature 40 °C, read previous temperature 39 °C, displayed storage temperature 30 °C, read
return temperature 31 °C means a setting of -20% (displayed T 10K, actual T 8K => -20% correction value)
The heat quantity data in the “On” mode only consists of calculated values for the functional inspection of the system.
Flow rate supply flow (X)
Nominal system flow.
The flow of the system in liters per minute, which is used as calculation basis for heat metering.
17
17


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Sorel SBMC at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Sorel SBMC in the language / languages: English as an attachment in your email.

The manual is 4.16 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Sorel SBMC

Sorel SBMC User Manual - German - 20 pages

Sorel SBMC User Manual - Dutch - 20 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info