41
The side table is recommended for any model, but especially in the case of the Mytho
Eco PV and Acqua Eco PV, due to the door opening and closing system. The table assembly
process is practically the same for all models, the only thing that changes is the size, but
it is the same philosophy. It can be purchased as an accessory with the following reference:
PA1090G070 - For Ecofogo, Mytho Eco, Mytho Eco PV and Zaima Eco models
PA1090G071 – For Acqua Eco and Acqua Eco PV models
In the box you will find the following components:
4 vertical columns 2 front and rear side rails
2 left and right side rails 4 screws DIN 912 M10x20mm
4 ft M10 levelers.
To assemble the leveling table, we recommend that you buy the transport bars shown
above (optional accessory), which make it easier for you to handle the equipment.
Follow the assembly order to make assembly easier and safer.
If possible, transport the unit with the packaging to the installation site using a pallet
truck. If this is not possible, we recommend that you purchase the transport wheel kit
(optional accessory), which will be discussed in the following points.