687262
94
Zoom out
Zoom in
Previous page
1/100
Next page
Grid configurations* IT, Delta-IT, TN-C, TN-S, TN-C-S, TT (when V
N_PE
<20V)
Approvals and national standards, as per
02/2017**
AS 4777, C10/11, CE, CEI 0-21,
DINEN62109 / IEC62109, EN50438,
G59/3, G83/2, NENEN50438, RD1699,
SI
4777, UTEC15-712, VDE0126-1-1,
VDE-AR-N4105, VFR2014
* IT, Delta-IT: When using in these systems, the grounding conductor monitoring must be deactivated and
an additional grounding connected to the inverter.
** AS4777: If DRM support is specified, the inverter may only be used in conjunction with a Demand
Response Enabling Device (DRED).
EN50438: does not apply to all national appendices of EN50438
IEC62109-2: This standard requires that the inverter is connected to SunnyPortal and that the fault
alert is activated in SunnyPortal.
NRS97-2-1: This standard requires a separate label attached to the AC distribution board which
indicates the AC-side disconnection of the inverter in case of a grid failure (for further details, see
NRS97-2-1, Sect.4.2.7.1 and 4.2.7.2)
14.3 Climatic Conditions
Installation in accordance with IEC60721-3-3, Class4K4H
Extended temperature range -25°C to +60°C
Extended humidity range 0% to 100%
Extended air pressure range 79.5kPato106kPa
Transport in accordance withIEC60721-3-2, Class2K3
Temperature range -25°C to +70°C
14.4 Protective Devices
DC reverse polarity protection Short-circuit diode
Input-side disconnection point DC load-break switch
AC short-circuit current capability Current control
Grid monitoring SMAGridGuard6
Maximum permissible fuse protection 32 A
Ground fault monitoring Insulation monitoring: R
iso
>200kΩ
All-pole sensitive residual-current monitoring unit Available
14.5 Equipment
DC connection SUNCLIX DC connector
14Technical Data
SMA Solar Technology AG
Operating ManualSB30-50-1AV-40-BE-en-1094
94


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for SMA Sunny Boy 5.0 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of SMA Sunny Boy 5.0 in the language / languages: English as an attachment in your email.

The manual is 2,56 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of SMA Sunny Boy 5.0

SMA Sunny Boy 5.0 User Manual - German - 104 pages

SMA Sunny Boy 5.0 User Manual - Dutch - 102 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info