11 Troubleshooting
SMA Solar Technology AG
Operating manual SBxx-1VL-40-BE-en-13 67
Event number Message, cause and corrective measures
901
PE conn. missing > Check connection
The grounding conductor is not correctly connected.
Corrective measures:
Ensure that the grounding conductor is correctly connected (see
Section6.2.2, page26).
1001
L/N swapped > Check connection
The connection of L and N is swapped.
Corrective measures:
Ensure that L and N are correctly connected (see Section6.2.2,
page26).
1101
Installation fault > Check connection
A second line conductor is connected to N.
Corrective measures:
Connect the neutral conductor to N (see Section6.2.2, page26).
1302
Waiting for grid voltage > Installation failure grid connection > Check
grid and fuses
L or N not connected.
Corrective measures:
Ensure that L and N are connected.
Make sure that the circuit breaker is switched on.
Ensure that the AC cable is not damaged and that it is connected
correctly.
1501
Reconnection fault grid
The changed country data set or the value of a parameter you have set does
not correspond to the local requirements. The inverter cannot connect to the
utility grid.
Corrective measures:
Ensure that the country data set has been configured correctly. To do this,
select the parameter Set country standard and check the value.
3301 to 3303
Unstable operation
There is not enough power at the DC input of the inverter for stable operation.
The inverter cannot connect to the utility grid.
Corrective measures:
Ensure that the PV array is designed correctly.
Ensure that the PV array is not covered by snow or otherwise shaded.
Ensure that the PV array is free of errors.
67


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for SMA Sunny Boy 2.0 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of SMA Sunny Boy 2.0 in the language / languages: English as an attachment in your email.

The manual is 1,49 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of SMA Sunny Boy 2.0

SMA Sunny Boy 2.0 User Manual - German - 98 pages

SMA Sunny Boy 2.0 User Manual - Dutch - 98 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info