84
1
Touch screen at upper
part of vertical line.
This will move embroi-
dery frame.
Once needle entry point
is correctly specified on
the Y axis vertical line,
press position memory
[1] for first point.
324
Turn handwheel to check
that needle is positioned
directly above Y axis
vertical line.
1. With Fabric Marker
draw a vertical (Y axis)
line on fabric.
3. Install fabric in
embroidery frame.
2. Draw a horizontal (X axis) line at right
angles to vertical line within sewing range
of embroidery frame.
* How to draw a
lateral line when a
Try Square is not
available:
* Points (Y axis vertical
line) must be at least 5
cm (2 inches] apart
1
Touch screen at lower
part of vertical line.
This will move embroi-
dery frame.
Press needle position direction
arrows so that needle point is
directly above Y axis vertical
line. For each needle entry
point, be sure to turn hand-
wheel to lower needle to verify
that needle point is directly
above Y axis vertical line.
Once needle entry point
is correctly specified on
the Y axis vertical line,
press position memory
[2] for second point.
324
Turn handwheel to check
that needle is positioned
directly above Yaxis
vertical line.
Preparation of fabric
10
Operation of LCD screen for specifying needle entry points “a” “b”and “c”
1. Specifying point “a”
2. Specifying point “b”
Use holes in four
corners of
embroidery frame
instead of a Try
Square.
a
b
c
a
b
Press needle position direction
arrows so that needle point is
directly above Y axis vertical line.
For each needle entry point, be
sure to turn handwheel to lower
needle to verify that needle point
is directly above Y axis vertical
line.
4. Checking needle entry points
by operating LCD screen,
specify needle entry points “a”
and “b” on Y axis vertical line
and “c” on lX axis horizontall
line.