761612
19
Zoom out
Zoom in
Previous page
1/52
Next page
- 19 -
Transport of the appliance
During the transport, you have to secure
all loose parts in and on the appliance, in
order to prevent damage.
The appliance should not be transported in
a vertical position and at the same time not
tilted over more than 30 degrees.
After each Transport
Wait 30 minutes after the installation,
before you connect the appliance to the
mains.
If the appliance was transported with a
tilt of more than 30 degrees, wait 4 hours
before you connect the appliance to the
mains.
Before the initial operation
Remove the protective sheets and all pack-
aging material incl. the transport securing
of the storage spaces and of the trays from
the appliance.
Dispose the packaging professionally.
You might notice a slight ‘new smell’ when
you start the appliance for the rst time.
It goes away once the appliance begins to
cool.
Clean the interior with tepid water with the
addition of washing-up liquid. Clean the
equipment separately with rinsing water,
not in the dishwasher.
Before you ll the appliance with food,
let it work for 24 hours, so that the target
temperature can be reached.
Installation of the appliance
The appliance should be installed in a dry
and well-aired room.
The appliance can be operated at a humidi-
ty of max. 70 %.
The surrounding temperature, at which the
appliance can be operated, can be taken
from the appliance specication sheet at
the end of this manual.
Do not install the appliance outdoors.
Bear in mind that you can pull the power
plug anytime.
Protect the appliance from direct insolation.
It should not be installed near heat sources
(stove, heater, etc.). If this, however,
cannot be avoided, you should put isolation
between the heat source and the appliance.
You must not imbed the appliance in a
cabinet. The installation of the fridge
directly under a board or a cabinet is
disallowed.
The unevenness
of the oor can be
compensated with
the two vertically
adjustable screw-in
feet in the front, so
that safe stability is
attained.
19


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Severin FRD 8994 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Severin FRD 8994 in the language / languages: English, German, Dutch, French as an attachment in your email.

The manual is 1,35 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info