804509
19
Zoom out
Zoom in
Previous page
1/64
Next page
17
Install the Battery Pack
NOTICE
Use soft cloth and/or plastic foam to protect the steering bar and mainframe from scratches when laying the mainframe flat. After
installing the battery pack, make sure all fasteners are tightened securely.
Use the large hex wrench to install the M5 x 12 socket cap head screw through the hole in the middle of the battery to the mainframe.
Use the smaller hex wrench to install the two M5 x 16 socket cap head screws through the two side/edge battery holes to the mainframe.
Charge the battery pack
WARNING
Do not insert the charging cord plug if the Charging Port, charging
cord, or AC Power outlet is wet.
1. Put your PTR in a clean, dry place, within the recommended
charging temperature range (see Ninebot PTR Battery
Pack), then pull back the Charging Port silicone gasket.
2. Plug one end of the charging cord (provided with your PTR)
into a grounded AC outlet (100V–240V; 50Hz–60Hz), then
plug the other end of the cord into the Charging Port.
3. Verify the riding platform LED indicators light up (C, E, T) and
the battery charge indicator appears on the dashboard (E, T
only).
4. When charging is complete, disconnect the charging cord
from the Charging Port, then disconnect the cord from the
grounded AC outlet. Replace the Charging Port silicone
gasket.
Figure 10: Installing the Battery
Figure 11: Charging the Battery
19


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Segway Ninebot E plus at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Segway Ninebot E plus in the language / languages: English as an attachment in your email.

The manual is 3.88 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info