781990
22
Zoom out
Zoom in
Previous page
1/52
Next page
www.scheppach.com
22 | GB
Idle setting screw (g. 3)
Using screw (5), the auger‘s idling mixture can be
adjusted. If the idling mixture is a little too high (the
boring head turn by itself in idle mode), the idling mix-
ture can be reduced by slowly turning the screw an-
ti-clockwise.
Warning! Other work on the carburettor must be car-
ried out by a specialist.
8. Operation
Before commissioning, it is important that you know
and follow the safety notices.
For all work on the earth auger, you must turn o󰀨 the
motor, disconnect the spark plug connector and wear
safety gloves. Start the auger only after complete as-
sembly and checking it.
WARNING! Carefully read the safety notices (see
„Safety notices“ and additional notices for petrol-pow-
ered machines).
Warning! Wear safety boots and tight-tting clothes in
order to prevent injuries.
Before commissioning, it is important that you know
and follow the safety notices
Observe national stipulations during work when us-
ing the auger on public property or paths.
Keep adults, children and animals away from the
hazardous area.
Check the working environment for foreign bodies
and remove them.
When leaving the machine, the motor must always
be turned o󰀨.
Check the earth auger for correct functioning and
its safe operating condition.
Do not work by yourself, someone has to be close
in case of emergencies.
Hold on to the earth auger with both hands when
working.
Ensure you have a safe position, during the drilling
process as well.
Do not lean too far forwards when working.
Check for a awless idling mode. The auger must
not rotate in idling mode when the motor is warm.
Immediately turn o󰀨 the motor when you can feel
changes to the machine‘s behaviour.
Do not place the hot auger in dry grass or on am-
mable objects (re risk!).
Drill the hole in the ground in several sections so
you can remove the soil in between.
Keep the auger vertical, do not twist it!
Always secure bore holes, otherwise there is a risk
of injury!
Exclusively drill holes in soil with the earth auger.
Other applications are not permitted.
7. Before operation
Assembly
For packaging reasons, your machine has not been
assembled completely.
Inserting the earth auger (g. 2)
Place the motor casing on a work bench. Place the
earth auger (7) on the drive shaft (6), ensuring that
both holes are aligned.
Insert the locking pin (A).
Fuelling (g. 1)
Open the fuel tank cap (15).
Pour in the fuel mixture using a funnel.
Do not ll the tank completely as fuel expands.
Close the fuel tank cap (15) tightly and clean the
area from possibly spilled fuel mixture.
Fuel mixture
The auger‘s motor is a two-stroke motor. It is driven
by a 1:40 fuel mixture made up of two-stroke oil and
fuel. The fuel requires unleaded ordinary petrol with
a research octane count of at least 91. Lubrication of
the motor takes place by adding premium two-stroke
oil.
Do not mix the fuel mixture in the fuel tank. Use the
mixing container supplied or another appropriate
container. Only pour the fuel mixture into the fuel tank
after previously mixing and stirring it well.
Use fresh, clean fuel. Water and contaminants in
the petrol damage the fuel system.
Refuel in a well-ventilated area with the motor not
running. If the motor was in use directly prior to re-
fuelling, leave it to cool down rst. Never refuel the
machine in a building where the petrol fumes can
reach ames or sparks.
Petrol is highly ammable and explosive. When
handling fuel, you may su󰀨er burns or other severe
injuries.
Turn o󰀨 the motor and keep away from heat, sparks
and ames.
Only ever refuel outside.
Wipe up spilled petrol straight away.
Starter cord (g. 1)
Pulling the cord (9) starts the motor.
Choke lever (g. 3)
The choke lever (C) closes and opens the choke in
the carburettor. In the position, the air-petrol-mix-
ture is enriched for the motor‘s cold start. The po-
sition is used for the operation of the motor and for a
warm start.
22


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Scheppach EB2000 SE at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Scheppach EB2000 SE in the language / languages: English, German, French as an attachment in your email.

The manual is 3.61 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info