490299
11
Zoom out
Zoom in
Previous page
1/28
Next page
9
GB
- 4 metres with 1 x 90° bend.
- 3 metres with 2 x 90° bends.
- 2 metres with 3 x 90° bends.
The above assumes our 150 mm (6 INS) ducting is being installed. Please note ducting components and
ducting kits are optional accessories and have to be ordered, they are not automatically supplied
with the chimney hood.
IN THE EXTRACTION MODE:
a. Place the anti-backow ats item 8 over the round outlet item 6 and connect the ducting 150mm (6
INS) over the round outlet item 6 on top of the canopy and secure the connections with appropriate
clamping rings or adhesive tape (Fig. 5).
b. Remove the grease lters (see paragraph Maintenance) being sure that the connector of the mains
cable is correctly inserted in the socket placed on the side of the fan. Before tting the chimney to
the canopy make the electrical connection as described in the section titled ELECTRICAL. When
the electrical connection has been made, test the lights and the fan motor.
c. Upper chimney stack
•Slightly widen the two sides of the upper chimney stack (Fig.5 - Item 7a) and hook them behind the
brackets item 2 making sure that they are well seated.
•Secure the sides to the brackets using the 4 screws 12c (2,9 x 9,5) supplied.
d. Lower chimney stack
•Slightly widen the two sides of the chimney stack (Fig. 5 - Item 7b) and hook them between the upper
chimey stack and the wall, making sure that they are well seated.
•Fix the lower part laterally to the hood body using the 2 screws 12c (2,9 x 9,5) supplied.
IN THE RECIRCULATION MODE:
a. Fit the recirculation spigot bracket item 4 onto the upper chimney wall bracket using the same xing
screws (Fig.7 - item 2). Put the spigot item R into the spigot brackets item 4• Make sure that the
outlet of the item R is horizontally and vertically aligned with the chimney outlets.
b. Connect the ducting 150mm (6 INS) not provided between motors item 6 and the recirculation spigot
and secure the connections with appropriate clamping rings or adhesive tape.
c. Remove the grease lters (see paragraph Maintenance) being sure that the connector of the feeding
cable is correctly inserted in the socket placed on the side of the fan. Before tting the chimney to
the canopy make the electrical connection as described in the section titled ELECTRICAL. When
the electrical connection has been made, test the lights and the fan motor.
d. Remove the metal grease lters and insert the charcoal lter into the base of the motor housing and
secure the lter with two metal securing straps item A as illustrated in Fig. 8.
e. Upper chimney stack
•Slightly widen the two sides of the upper chimney stack (Fig.7 - Item 7a) and hook them behind the
brackets item 2 making sure that they are well seated.
•Secure the sides to the brackets using the 4 screws 12c (2,9 x 9,5) supplied.
f. Lower chimney stack
•Slightly widen the two sides of the chimney stack (Fig. 7 - Item 7b) and hook them between the upper
chimey stack and the wall, making sure that they are well seated.
•Fix the lower part laterally to the hood body using the 2 screws 12c (2,9 x 9,5) supplied.
11


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Roblin ATRIUM Asymetrique at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Roblin ATRIUM Asymetrique in the language / languages: English, German, Dutch, French, Italian, Spanish as an attachment in your email.

The manual is 2,44 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info