615075
77
Zoom out
Zoom in
Previous page
1/85
Next page
75
COMPONENT CONNECTION TORQUE
Frame Connection between the front and rear frames:
4 M10 screws
30–40 Nm
Fork Steerer tube clamp above the headset (2 screws)
Clamp on steering lever on right side of for tube:
4 M5 screws
Swivel head of the steering lever (M8)
12–14 Nm
5–6 Nm
12–14 Nm
Steering linkage Counter nut M8, swivel head on steering linkage
Front and rear end steering linkage: screw and M6 nut
Universal joint: screw and M8 nuts
9–12 Nm
9–12 Nm
12–14 Nm
Kickstand Counter nuts M8
Eye bolts and M5 nuts for kickstand spring
12–14 Nm
5–6 Nm
COMPONENT CONNECTION TORQUE
Stem Clamping screws M6 (4 pieces)
Front clamping screws M6 (2 pieces)
Rear clamping screws M5 (2 pieces)
Set screws for quick-release for
for angle adjustment (2 pieces)
7–9 Nm
7–9 Nm
3–4 Nm
1 Nm
LOAD: TORQUE SETTINGS
STEM AT KENDU/LOAD: TORQUE SETTINGS
77


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Riese Muller Avenue Hybrid II - 2013 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Riese Muller Avenue Hybrid II - 2013 in the language / languages: English as an attachment in your email.

The manual is 1,76 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Riese Muller Avenue Hybrid II - 2013

Riese Muller Avenue Hybrid II - 2013 User Manual - German - 86 pages

Riese Muller Avenue Hybrid II - 2013 User Manual - French - 86 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info