Functional checks and test
run
Check the following points:
Tightness of the refrigerant
pipes.
Compressor and fan running
smoothly.
In cooling mode, cold air should
be output by the indoor unit,
and warm air should be output
by the outdoor component.
Functional test of the indoor
unit and all program sequences.
Check the surface temperature
of the suction pipe and deter-
mine the overheating of the
vaporiser.
Measure the temperature by
holding a thermometer against
the suction pipe and subtract-
ing the boiling point tempera-
ture indicated on the pressure
gauge.
Record the measured tem-
peratures in the commissioning
report.
Check that the stop valves
and valve caps are tight after
carrying out any work on the
refrigerant circuit. If necessary,
use appropriate sealant
products.
NOTE
open the stop valves by turning
them anti-clockwise using a
spanner. If leaks are found,
repair the faulty connection. It
is imperative that the vacuum
creation and drying steps are
repeated!
5. Switch off the main circuit
breaker or remove the fuse
(provided by the customer).
6. Use the remote control to
switch on the unit and select
the cooling mode, maximum
fan speed and lowest target
temperature.
7. Measure and record all
the required values in the
commissioning report and
check the safety functions.
8. Check the indoor unit control
system using the functions
described in the chapter
"Operation". Timer,
temperature setting, fan speeds
and switching to ventilation or
dehumidifying mode.
9. Check the correct function
of the condensation pipe by
pouring distilled water into the
condensation tray.
A bottle with a spout is
recommended for pouring the
water into the condensation
tray.
10.Switch the indoor unit to
cooling mode.
11.Check the correct function
and settings of all regulation,
control and safety devices
during the test run.
12.Check the control system in the
indoor unit using the functions
described in the manual.
Timer, temperature settings and
all mode settings.
13.Check the overheating,
outdoor, indoor, outlet and
vaporisation temperatures and
record the measured values in
the commissioning report.
14.Switch the indoor unit to
heating mode.
15.Check all the previously
described safety devices and
functions during the test run.
16.Record the measured values in
the commissioning report.
17.Remove the pressure gauge.
Check that seals have been
fitted in the sealing caps.
Final tasks
Re-fit all the dismantled parts.
Instruct the operator on how to
use the equipment.
Functional test for cooling and
heating modes
1. Remove the protective caps on
the valves.
2. Start the commissioning
procedure by briefly opening
the stop valves on the outdoor
component until the pressure
gauge
indicates a pressure of approx.
2 bar.
3. Use leak detection spray or
suitable devices to check that
all the connections are tight.4.
If no leaks are found, fully
27
27


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for REMKO SV521 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of REMKO SV521 in the language / languages: English as an attachment in your email.

The manual is 3,15 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of REMKO SV521

REMKO SV521 User Manual - German - 32 pages

REMKO SV521 User Manual - Dutch - 32 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info