726597
27
Zoom out
Zoom in
Previous page
1/68
Next page
6.2 Leak testing
Once all the connections have been made, the
pressure gauge station is attached to the Schrader
valve as follows (if fitted):
red = small valve = high pressure
blue = large valve = suction pressure
Once the connection has been made successfully
,
the leak test is carried out with dry nitrogen.
Leak testing involves spraying a leak detection
spray onto the connections. If bubbles are visible,
the connections have not been made properly. In
that case, tighten the connection or, if necessary,
create a new flange.
After completing a successful leak test, the excess
pressure in the refrigerant piping is removed and a
vacuum pump with an absolute final partial pres-
sure of min. 10 mbar is used to remove all of the
air and empty the pipes. Any moisture present in
the pipes will also be removed.
NOTICE!
A vacuum of at least 20 mbar must be pro-
duced!
The time required to generate the vacuum is
dependent on the final pressure pipe volume of the
indoor units and the length of the refrigerant piping.
However
, the process will take at least 60
minutes. Once any foreign gases and humidity
have been completely extracted from the system,
the valves on the pressure gauge station are
closed and the valves on the outdoor unit are
opened as described in the "Commissioning" sec-
tion.
6.3 Additional notes on connecting
the refrigerant piping
When combining the outdoor unit with the different
indoor units, the refrigerant piping connection may
differ. Install the corresponding expansion fittings
(sleeves) on the distributors. Depending on the
number of distributors and total length of the liquid
line, add refrigerant when commissioning the
system for the first time (see
Ä
Chapter
6.4 ‘Adding refrigerant’ on page 27).
6.4 Adding refrigerant
The unit contains a basic quantity of refrigerant.
Furthermore, an additional amount of refrigerant
must be added, in accordance with the following
table:
Component Fill factor
Length of the liquid pipe 1/4" 0.023 kg/m
Length of the liquid pipe 3/8" 0.060 kg/m
Number of distribution units (4-fold) 0.1 kg/unit
Number of Y-pieces 0.1 kg/unit
CAUTION!
W
ear protective clothing when handling refrig-
erant.
DANGER!
Only refrigerant in a liquid state may be used to
fill the cooling cycle!
NOTICE!
Check the overheating to determine the refrig-
erant fill quantity
.
NOTICE!
The escape of refrigerant contributes to climatic
change. In the event of escape, refrigerant with
a low greenhouse potential has a lesser impact
on global warming than those with a high
greenhouse potential. This device contains
refrigerant with a greenhouse potential of 1975.
That means the escape of 1 kg of this refrig-
erant has an ef
fect on global warming that is
1975 times greater than 1 kg CO
2
, based on
100 years. Do not conduct any work on the
refrigerant circuit or dismantle the device -
always enlist the help of qualified experts.
27
27


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for REMKO MVV 2000 DC at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of REMKO MVV 2000 DC in the language / languages: English as an attachment in your email.

The manual is 3,87 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of REMKO MVV 2000 DC

REMKO MVV 2000 DC User Manual - German - 68 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info