Be sure to check the
association of the electrical
and refrigerant pipes before
commissioning!
The connections of the
individual circuits may not be
mixed up.
Mixing up the assignment of
control lines and refrigerant
pipes can lead to fatal
consequences (compressor
damage)!
Commissioning of the
individual circuits must be
carried out successively.
CAUTION
Function test and test run
Check the following points:
Leak tightness of refrigerant
pipes.
Compressor and fan running
smoothly.
In cooling mode, cold air should
be output by the indoor unit,
and warm air should be output
by the outdoor unit.
Functional test of the indoor
unit and all program sequences.
Check of the surface
temperature of the suction pipe
and determination of vaporiser
overheating.
To measure the temperature,
hold the thermometer to the
suction pipe and subtract the
boiling point temperature
reading on the pressure
gauge from the measured
temperature.
Record the measured
temperatures in the
commissioning report.
Functional test for cooling mode.
1. Remove the protective caps
from the valves.
2. Begin the commissioning
process by briefly opening the
stop valves on the outdoor
unit until the pressure gauge
indicates a pressure of approx.
2 bar.
3. Use leak detection spray or
suitable devices to check that
all the connections are tight. If
no leaks are found, fully open
the stop valves by turning them
anti-clockwise using a spanner.
If leaks were found, draw off
the refrigerant and rework
the defective connection. It
is imperative that the vacuum
creation and drying steps are
repeated!
4. Switch off the main circuit
breaker or remove the fuse
(provided by the customer).
5. Set the target temperature
on the indoor unit using the
remote control. This should be
set to a value lower than the
room temperature.
6. Switch the indoor unit to
cooling mode.
NOTE
Due to the turn on delay, the
compressor will start up a few
minutes later.
8. Check the control system in the
indoor unit using the functions
described in the manual.
Timer, temperature settings and
all mode settings.
9.
Check the overheating,
outdoor, indoor, outlet and
vaporisation temperatures and
record the measured values in
the commissioning report.
10.
Remove the pressure gauge.
11.
Proceed as previously described
for all other refrigerant circuits.
Check that the stop valves
and valve caps are tight after
carrying out any work on the
refrigerant circuit. If neces-
sary, use appropriate sealant
products.
NOTE
Check the individual operating
parameters with the help of
the display on the outdoor
unit as described on page
22 and note the value in the
commissioning protocol.
NOTE
Final tasks
Use the remote control to set
the target temperature to the
required value.
Re-fit all the dismantled parts.
Familiarize the operator with
the system.
7. Check the correct function
and settings of all regulation,
control and safety devices
during the test run.
21
21


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for REMKO MVT950 DC at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of REMKO MVT950 DC in the language / languages: English as an attachment in your email.

The manual is 1,43 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of REMKO MVT950 DC

REMKO MVT950 DC User Manual - German - 28 pages

REMKO MVT950 DC User Manual - German - 28 pages

REMKO MVT950 DC User Manual - Dutch - 28 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info