For the commissioning of the
entire system, the operating
instructions of the unit and all
other components must be
observed.
Commissioning may be
performed by specially trained
expert personnel only and
documented according to the
certificate.
NOTE
Commissioning
Function test of the
cooling mode:
1. Switch on the power supply.
2. Open all shut-off valves if nec-
essary.
3. Switch on the unit and the per-
tinent circulation pump at the
highest power level. The outlet
temperature must lie between
+4 and +18°C.
4. Switch on the unit and select
the cooling mode.
If the return temperature is
warmer than the setting, the
compressor indicator flashes
and the compressor begins
to function after about 3 to 5
minutes.
5. Please note that the inlet flow
temperatures lies about 5 K
below the return temperature
at the nominal volume flow rate
of the medium.
- If the inlet flow temperature
falls below the factory setting
of 4°C, a fault will be indi-
cated.
If this is the case, the return
temperature must be set to
a higher value. If the spread
is too large or too small, the
volume flow rate must be
checked.
- The circulation pump starts up
and the control system checks
the medium volume flow rate
using the differential pressure
monitor.
If the volume is too low, a
fault deactivation will be per-
formed and the cooling circuit
will not obtain an enable.
6. Measure all required values,
enter them in the commission-
ing log, and check the safety
functions.
7. Check the unit control system
with the functions described in
the "Operation" chapter.
Final measures
Mount all dismantled parts.
Train the plant owner in the
system.
The factory delivery of the
units includes a standard
parameterisation of the power
control.
If necessary, have authorised
specialist personnel perform a
system-specific setting of the
parameters during commis-
sioning.
NOTE
37
37


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for REMKO KWG750 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of REMKO KWG750 in the language / languages: English as an attachment in your email.

The manual is 7,1 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of REMKO KWG750

REMKO KWG750 User Manual - German - 60 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info