587580
23
Zoom out
Zoom in
Previous page
1/28
Next page
Commissioning
Commissioning should only be
performed and documented by
specially trained personnel.
When starting up the
complete system, observe
the instructions given in the
manuals for the indoor unit
and outdoor component.
NOTE
Final tasks
Re-fit all the dismantled parts.
Instruct the operator on how to
use the equipment.
Functional test for
cooling mode
1. Switch on the supply voltage
on.
2. Use the remote control to
switch on the unit and select
the cooling mode, maximum
fan speed and lowest target
temperature.
3. Measure and record all
the required values in the
commissioning report and
check the safety functions.
4. Check the indoor unit
control system using the
functions described in the
chapter "Operation". Timer,
temperature setting, fan speeds
and switching to ventilation or
dehumidifying mode.
Check that the stop valves
and valve caps are tight after
carrying out any work on the
refrigerant circuit. If necessary,
use appropriate sealant
products.
NOTE
5. Check the correct function
of the condensation pipe by
pouring distilled water into the
condensation tray.
A bottle with a spout is
recommended for pouring the
water into the condensation
tray.
23
Unit dimensions
We reserve the right to modify the dimensions and constructional design as part of the ongoing technical development process.
ATY 260 IT / ATY 350 IT
148
567
567
All values in mm
495
470
396
45
25
47
23


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for REMKO ATY261 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of REMKO ATY261 in the language / languages: English as an attachment in your email.

The manual is 1,65 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of REMKO ATY261

REMKO ATY261 Additional guide - German - 1 pages

REMKO ATY261 User Manual - German - 28 pages

REMKO ATY261 User Manual - Dutch - 28 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info