689791
53
Zoom out
Zoom in
Previous page
1/88
Next page
4. Unscrew the nut of the gas valve unit.
5. Remove the air inlet pipe from the venturi.
6. Unscrew the front plate nuts.
7. Carefully lift the front plate, including the burner and fan, away from
the heat exchanger.
8. Use a vacuum cleaner fitted with a special end piece (accessory) to
clean the top part of the heat exchanger (combustion chamber).
9. Vacuum again without the top brush on the end piece.
10. Clean the lower section of the heat exchanger with the special
cleaning blade (accessory).
11. Check (e.g. using a mirror) whether any visible contamination has
been left behind. If it has, remove it with the vacuum cleaner.
12. Check that the burner cover of the dismantled burner is free from
cracks and/or damage. If not, replace the burner.
Servicing the burner is usually not necessary, it is self-cleaning. Use
compressed air to carefully blow away any dust.
13. Reassemble the unit in reverse order.
Caution
Check that the gasket is correctly positioned between the mixing
elbow and the heat exchanger. The gasket must lie absolutely
flat in the appropriate groove to ensure that no gas can leak.
Remember to reconnect the fan plugs.
Tighten the nut on the gas valve unit with a torque of 27.5 N⋅m.
Tighten the front plate nuts with a torque of 10 N⋅m.
14. Open the gas supply and switch the power supply to the boiler back
on.
Fig.61 Removing the gas and air supply
pipes
AD-3001971-01
4
5
Fig.62 Removing the front plate, fan and
burner
AD-3001179-01
6
7
Fig.63 Cleaning the heat exchanger
AD-3001180-02
8 9
10
11 12
9 Maintenance
7684359 - v.11 - 13122021 53
53


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Remeha Quinta ACE 65 T-Control at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Remeha Quinta ACE 65 T-Control in the language / languages: English as an attachment in your email.

The manual is 4.19 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Remeha Quinta ACE 65 T-Control

Remeha Quinta ACE 65 T-Control Usermanual and installation guide - German - 116 pages

Remeha Quinta ACE 65 T-Control Usermanual and installation guide - Dutch - 80 pages

Remeha Quinta ACE 65 T-Control Usermanual and installation guide - French - 84 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info