689791
31
Zoom out
Zoom in
Previous page
1/88
Next page
Caution
If possible, use the pump modulation signal. This provides the
most accurate pump control.
If the automatic burner unit does not support pump modulation,
the pump will behave as an on/off pump.
5.5.7 Connecting the standard pump
The pump must be connected to the standard control PCB. To do this,
proceed as follows:
1. Connect the X81 power cable to the pump.
2. Remove the grommet from the opening in the middle of the base of
the boiler.
3. Pass the pump X81 cable through the base of the boiler and seal the
opening by tightening the bayonet fitting to the cable.
4. Connect the X81 pump cable to the X81 cable that runs along the
cable duct to the left of the instrument box.
5.5.8 Connecting the PWM pump
The energy-efficient modulating pump must be connected to the standard
control PCB. To do this, proceed as follows:
1. Connect the power supply cable and the cable for the PWM signal to
the pump.
2. Remove the grommet from the opening in the middle of the base of
the boiler.
3. Pass the pump power supply cable through the base of the boiler and
seal the opening by tightening the bayonet fitting to the cable.
4. Pass the PWM cable from the pump through one of the grommets on
the right in the base of the boiler.
5. Connect the X81 pump power supply cable to the X81 cable that runs
along the cable duct to the left of the instrument box.
6. Connect the X116A pump PWM cable to the X112 cable that runs
along the cable duct to the right of the instrument box.
Important
The pump's various settings can be adjusted using the
parameters.
Fig.37 Connecting the power supply cable
AD-4000093-01
X81
2
3
1
X81
X81
4
Fig.38 Connecting the power supply cable
AD-4000094-03
2
3
X81
X116a
4
1
5
6
X81
X81
X116a
X112
X120
5 Installation
7684359 - v.11 - 13122021 31
31


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Remeha Quinta ACE 65 T-Control at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Remeha Quinta ACE 65 T-Control in the language / languages: English as an attachment in your email.

The manual is 4.19 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Remeha Quinta ACE 65 T-Control

Remeha Quinta ACE 65 T-Control Usermanual and installation guide - German - 116 pages

Remeha Quinta ACE 65 T-Control Usermanual and installation guide - Dutch - 80 pages

Remeha Quinta ACE 65 T-Control Usermanual and installation guide - French - 84 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info