805749
15
Zoom out
Zoom in
Previous page
1/76
Next page
4.4 Requirements for the gas connection
Carry out any welding work required at a safe distance from the boiler.
Before installing, check that the gas meter has sufficient capacity. Take
into account the consumption of all appliances. Notify the local energy
company if the gas meter has insufficient capacity.
We recommend installing a gas filter to prevent clogging of the gas
valve unit.
4.5 Requirements on the flue gas discharge system
4.5.1 Classification
Important
The installer is responsible ensuring that the right type of flue
gas outlet system is used and that the diameter and length are
correct.
Always use connection materials, roof terminal and/or outside
wall terminal supplied by the same manufacturer. Consult the
manufacturer for compatibility details.
Tab.5 Type of flue gas connection: B23P
Principle Description Recommended manufactur
ers(1)
AD-3000924-01
Room-ventilated version
Without down-draught diverter.
Flue gas discharge via the roof.
Air from the installation area.
The air supply opening of the boiler must stay open.
The installation area must be vented to ensure sufficient air
supply. The vents must not be obstructed or shut off.
The IP rating of the boiler is lowered to IP20.
Connection material and roof
terminal:
Muelink & Grol
(1) The material must also satisfy the material property requirements from the relevant chapter.
Tab.6 Type of flue gas connection: C13
Principle Description Recommended manufactur
ers(1)
AD-3000926-01
Room-sealed version
Discharge in the outside wall.
Air supply opening is in the same pressure zone as the dis
charge (e.g. a combined outside wall terminal).
Parallel wall terminal not permitted.
Outside wall terminal and con
nection material:
Remeha, combined with con
nection material from Muelink
& Grol
Muelink & Grol
(1) The material must also satisfy the material property requirements from the relevant chapter.
4 Preparation of installation
7701838 - v.09 - 10122021 15
15


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Remeha Quinta Ace 160 - T Control at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Remeha Quinta Ace 160 - T Control in the language / languages: English as an attachment in your email.

The manual is 3.13 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info