4.3 Requirements for water connections
Before installation, check that the connections meet the set
requirements.
Carry out any welding work required at a safe distance from the boiler.
If using synthetic pipes, follow the manufacturer's instructions.
4.3.1 Requirements for the central heating connections
We recommend installing a central heating filter in the return pipe to
prevent clogging of boiler components.
4.3.2 Requirements for the condensate drain
The drain pipe must be Ø 32 mm or larger, terminating in the drain.
Use only plastic material for the discharge pipe due to the acidity (pH 2
to 5) of the condensate.
Fit a watertrap or siphon in the drain pipe.
The drain pipe must slope down at least 30 mm per metre, the maximum
horizontal length is 5 metres.
Do not make a fixed connection in order to prevent an overpressure in
the siphon.
4.3.3 Flushing the system
The installation must be cleaned and flushed in accordance with BS 7593
(2019) and BSRIA BG 33/2014.
Before a new boiler can be connected to a system, the entire system must
be thoroughly cleaned by flushing it. The flushing will remove residue from
the installation process (weld slag, fixing products etc.) and accumulations
of dirt (silt, mud etc.)
Important
Flush the heating system with a volume of water equivalent to at
least three times the volume of the system.
Flush the domestic hot water pipes with at least 20 times the
volume of the pipes.
Important
Due to the presence of an aluminium heat exchanger, suitable
chemicals and the correct use of these chemicals should be
discussed with specialist water treatment companies.
4 Preparation of installation
14 7701838 - v.09 - 10122021
14


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Remeha Quinta Ace 135 - T Control at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Remeha Quinta Ace 135 - T Control in the language / languages: English as an attachment in your email.

The manual is 3.13 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info