805735
72
Zoom out
Zoom in
Previous page
1/92
Next page
1. Undo the 3 bolts from the adapter on the non-return valve holder (15
Nm torque).
2. Remove the ionisation/ignition electrode.
3. Undo the 3 nuts from the adapter on the heat exchanger (15 Nm
torque).
4. Carefully remove the adapter with burner from the heat exchanger.
5. Remove the 4 bolts from the fan and remove the non-return valve
holder (5.5 Nm torque).
6. Check whether traces of condensation are visible on the inside of the
fan.
Always replace the non-return valve along with the holder in the
event of visible traces of condensation or damage.
7. Reassemble in the reverse order.
Caution
Use the specified torques when fitting nuts and bolts.
Make sure the gaskets are in place when fitting nuts and bolts.
10.4.3 Reassembling the boiler
1. Fit all removed parts in the reverse order.
2. During inspection or maintenance work, always replace all gaskets of
the disassembled parts.
3. Check the tightness of the gas and water connections.
4. Put the boiler back into operation.
Fig.92 Checking the non-return valve
AD-0001188-01
1
4
4
5
3
6
2
Fig.93 Putting the boiler into operation
AD-0000132-01
Check
Contrôler Check
Contrôler
10 Maintenance
72 7665063 - v.05 - 18102018
72


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Remeha Gas 220 Ace at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Remeha Gas 220 Ace in the language / languages: English as an attachment in your email.

The manual is 9.39 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Remeha Gas 220 Ace

Remeha Gas 220 Ace Usermanual and installation guide - German - 88 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info