815515
12
Zoom out
Zoom in
Previous page
1/32
Next page
04/237039-804H12
Baffle Board even with front tube & resting
on all tubes
Burn Rate
Air Control
Start-Up Air
Control
Figure 12.1
E. Building A Fire
Before lighting your rst re in the appliance:
NOTE: The special high temperature paint that your
appliance is nished with will cure as your appliance
heats. You will notice an odor and perhaps see some
vapor rise from the appliance surface; this is normal.
We recommend that you open a window until the odor
dissipates and paint is cured.
Tube Channels
Ceramic Blanket on Top
2 pc Baffle Board
Figure 12.2
NOTE:
Build re on brick rebox oor.
Do NOT use grates, andirons or other methods to
support fuel. It will adversely a󰀨ect emissions.
1. Conrm the ba󰀪e is correctly positioned. It should be
even with the front tube and resting on all tubes (Figure
12.1 and Figure 12.2).
2. Remove all labels from glass and inside of appliance.
There are many ways to build a re. The basic principle
is to light easily-ignitable tinder or paper, which ignites the
fast burning kindling, which in turn ignites the slow-burning
rewood. Here is one method that works well:
1. Open the Burn Rate Air and ACC Controls fully (Refer to
the Quick Start Guide on page 6).
2. Place several wads of crushed paper on the rebox oor.
Heating the ue with slightly crumpled newspaper before
adding kindling keeps smoke to a minimum.
3. Lay small dry sticks of kindling on top of the paper.
4. Make sure that no matches or other combustibles are in
the immediate area of the appliance. Be sure the room is
adequately ventilated and the ue unobstructed.
5. Light the paper in the appliance. NEVER light or rekindle
re with kerosene, gasoline, or charcoal lighter uid; the
results can be fatal.
6. Once the kindling is burning quickly, add several full-
length logs 3 inches (76mm) or 4 inches (102mm) in
diameter. Be careful not to smother the re. Stack the
pieces of wood carefully; near enough to keep each
other hot, but far enough away from each other to allow
adequate air ow between them.
7. Set the Burn Rate Air Control and activate the ACC timer
system.
8. When ready to reload, It is best to fully open both the Burn
Rate Air and Start-up Air Controls before reloading. This
livens up the coal bed and reduces excessive emissions
(opacity/smoke). Open door slowly so that ash or smoke
does not exit appliance through opening. Large logs
burn slowly, holding a re longer. Small logs burn fast
and hot, giving quick heat.
9. As long as there are hot coals, repeating steps 6 through
8 will maintain a continuous re.
Fire Risk.
Do not leave the re unattended when
the door is unlatched or when using the
re screen.
Unstable rewood could fall out of the
rebox creating a re hazard to your home.
WARNING
Fire Risk.
Do NOT store wood:
Closer than required clearances to
combustibles to appliance
Within space required for loading or
ash removal.
Do NOT operate appliance:
With appliance door open.
With ash removal system door open.
WARNING
Fire Risk.
Do NOT burn wet or green wood.
Store wood in dry location.
Stack wood so both ends are exposed
to air.
Wet, unseasoned wood can cause
accumulation of creosote.
WARNING
12


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Quadra-Fire Discovery I at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Quadra-Fire Discovery I in the language / languages: English as an attachment in your email.

The manual is 8.53 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Quadra-Fire Discovery I

Quadra-Fire Discovery I User Manual - French - 32 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info