685357
12
Zoom out
Zoom in
Previous page
1/44
Next page
OPERATING THE ENGINE
ENGINE STARTING CONTROLS
1) Generator Main / ECU Reset Switch must be in the ON position.
2) Hold Start/Stop Switch for 1 second and release.
3) Glow Plugs will preheat for 8 seconds. LED flashes slowly.
4) Preheating will cease during engine cranking cycle. LED continues flashing.
5) Engine begins an 8 seconds crank cycle, After 4 seconds of cranking the PT-ECU-63 will check
for an AC signal from the generator. If an AC signal is verified the engine will start and the LED
will remain ON during the normal run operation. If the AC signal is not verified the PT-ECU-63
will terminate the cranking cycle and LED will flash a fault code.
6) Starter disengages immediately after engine run is verified.
7) PT-ECU-63 deactivates the Low Oil Pressure and High Water Temperature Switches for 6
seconds, this will assure oil pressure build-up time. If oil pressure does not build-up the engine will
immediately shut down and go into a fault mode. Likewise for a high temperature situation.
8) If engine will not start on the first attempt the PT-ECU-63 will initiate the start cycle 2 more times
before going into a fault mode. Glow Plugs will preheat for 8 seconds per attempt. Engine will
crank for 8 seconds per attempt.
9) To shut down the engine under normal operations, hold the Start/Stop Switch for 1 second and
release.
10) If a fault occurs turn Generator Main / ECU Reset Switch OFF and then ON to reset PT-ECU-63.
The Main /ECU Reset Switch is located on the generator end, inside the service access door.
NOTE: A RED
indicator light on the control panel will illuminate during the start cycle and then turn off
once oil pressure builds up. If oil pressure drops off during normal operations the RED light will come on
as a “WARNING” only. The operator must shut down the unit immediately and investigate the problem.
This feature is separate from the Low Oil Pressure Switch connected to the PT-ECU-63.
CHECKING ENGINE AFTER STARTING
1) Allow the engine to warm up 3 to 5 minutes before applying a load. In colder climates allow a few
extra minutes longer.
2) Perform a visual inspection of all areas of the engine and generator.
3) Listen for any abnormal noises.
4) Check for any abnormal exhaust gases.
STOPPING THE ENGINE
It is recommended to disconnect or reduce the power load from the generator before shutting down the
engine. Then follow the steps outlined above for normal shut down.
NOTE: The PT-ECU-63 is designed to operate on 12V DC power. In a low battery situation the
PT-ECU-63 may not initiate the normal cranking cycle. To start the generator you can press and
hold the Start/Stop Switch for approximately 10 seconds or until the engine starts. Once the
engine starts the PT-ECU-63 will resume normal operations. If this situation re-occurs, charge or
replace the battery.
IMPORTANT: Damage to the Starter Motor, Starter Solenoid, Run Solenoid or any generator component
due to excessive or prolonged starting attempts attributed to an external Low Battery Control Monitoring
or Auto-Start System will not be covered by the Power Technology Southeast, Inc. Limited Warranty.
2
12


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for PowerTech PTRV-3 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of PowerTech PTRV-3 in the language / languages: English as an attachment in your email.

The manual is 1,76 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info