643484
16
Zoom out
Zoom in
Previous page
1/72
Next page
FLOOR
PROTECTION
FLOOR
METAL CHASSIS
A
B
Fig. 22
The stove has been tested and listed for mobile home installations.
Unit must be installed in accordance with the: Manufactured Home
and Safety Standard (HUD), CFR 3280, Part 24.
In addition to all previously detailed requirements, mobile home
installations must observe the following:
- Permanently bolt the stove to the oor. Use 4 screws [A] through the
4 holes placed at left and right side in the base plate as shown in
gure 22.
- Electrically ground the stove to the metal chassis of the home using a
number 8, gauge or larger copper wire [B].
- Maintain an effective vapor barrier at location where PL vent exits the
structure.
- Floor protection and clearances requirement must be followed
precisely as shown in the previous paragraphs.
- PL Vent must be used for exhaust venting. (Single wall vent is not
allowed). Follow PL Vent manufacturer’s installation directions and
observe all listed clearances to combustibles.
- Check any other local buildings codes or other codes that may apply.
d WARNING: DO NOT INSTALL IN A SLEEPING ROOM.
a Combustion air must come from the outside of the mobile
home!
Failure to do so may create negative pressure within the
mobile home and could disrupt proper venting and operation
of the pellet stove.
The user must routinely inspect the point where air is drawn
in to insure that it is clear of leaves/debris and ice or snow.
a CAUTION: THE STRUCTURAL INTEGRITY OF THE FLOORS,
WALLS, CEILING AND ROOF MUST BE MAINTAINED.
a The stove is hot while running. Keep children, clothing and
furniture away. Contact may cause skin burns.
a Keep combustible materials such as grass, leaves,etc. at least
4 ft away from the point directly under the vent termination.
DT2010027-02
1.15 MOBILE HOME INSTALLATION
H07032120 / DT2002308 – 00
16
English
DT2032938-00
16


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Piazzetta P963 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Piazzetta P963 in the language / languages: English as an attachment in your email.

The manual is 4,78 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info