749292
28
Zoom out
Zoom in
Previous page
1/72
Next page
28 GB/IE
Environmental instructions ... / Information about warranty and ... / Warranty termsPreparing to weld / Welding / Overheat protection / Maintenance
Welding
After making all the electrical connections for the
power supply and for the welding circuit, proceed
as follows:
Insert the uncoated end of the electrode into
the electrode holder 5 and connect the earth
terminal 4 to the work piece. Be sure the
electrical contact is good.
The device features a latch for setting the plate
thickness. Switch on the device by setting the
ON / OFF switch 2 to the “ON“ position. Then
use the hand wheel 3 to select the electrode
thickness: For 1.6 or 2.0 mm electrodes set the
hand wheel 3 to position 1.6 / 2.0. For 2.5
mm electrodes set the hand wheel 3
2.5.
Hold the welding shield 7 in front of your face
and guide the tip of the electrode over the work
piece as if trying to light a match. This is the best
method for sparking the arc.
Use a test piece to check if you selected the
correct electrode and current.
ATTENTION!
Do not dab the work piece with the electrode. It
could become damaged and make it more difficult to
spark the arc. Once the arc is sparked, try to main-
tain a distance to the work piece appropriate for the
selected electrode diameter. Keep the distance as
consistent as possible whilst welding. The electrode
grade in the work flow direction should be 20–30
degrees.
ATTENTION!
Always use forceps to dispose of used electrodes or
move hot work pieces. Please remember to always
place the electrode holder onto an insulating pad
after welding.
Only remove slag once the seam has cooled. If
continuing to weld on an interrupted weld seam,
first remove the slag at the start of weld.
ATTENTION!
Welding produces heat. The welding equipment
must therefore be operated in open loop after use
for at least half an hour. Or alternatively allow the
equipment to cool off for one hour. Only pack up
and store the equipment once the equipment tem-
perature has normalised.
Switch the equipment off by setting the ON /
OFF switch 2 to the “OFF“ position.
Overheat protection
The welding equipment features overheat protection.
If the overheat protection is triggered, the control
light 6 will light up. Allow the welding equipment
to cool down for a while.
PESG 120 B4 (with AC 230 V 50 Hz power plug):
The supply line fuses to the mains sockets must meet
the requirements (VDE 0100). Earthed wall sockets
must be protected with max. 16 A (model and tech-
nical data: NDM1-63, AC 230 / 400 V C16.
IEC 60898.time lag. Manufacturer: Nader) (fuses
or line circuit breaker). Higher fuse ratings can result
in burnt wires or fire damage to the building.
Attention: The equipment must be connected to
a mains source with the fuse rating specified above.
If the electrode holder and earth terminal is short
circuited, the fuse can be triggered in 16–20 secon
ds.
Classification per EMV standard: Class B per IEC
60974-10
Warning: When used in other areas,
areas, electromagnetic tolerance may not be war-
ranted or failures may occur.
Maintenance
Regularly clean dust and dirt off the equipment.
Clean the equipment with a fine brush or a dry
cloth.
to position
Note: The weldable material thickness is
1.5mm - 3.0mm.
28


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Parkside IAN 310867 PESG 120 B4 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Parkside IAN 310867 PESG 120 B4 in the language / languages: English, German, Dutch, French as an attachment in your email.

The manual is 2,75 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info