709099
15
Zoom out
Zoom in
Previous page
1/45
Next page
4
GB
Retain these installation, operating and maintenance instructions for the full duration of the operators service life!
4
13
full lenght.
Push connector (7) centrally over the joint.
Attach central support (13) to track (8) in front of the
connector (7).
Positioning the prefitted operator at an angle to the
door, screw to wall bracket (10). Lift up operator,
making sure that it cannot fall down, and align in such
a way that the track runs horizontal and parallel
between the door tracks.
Establish the length of the support straps for the
operator head and the central support. If necessary,
shorten using a saw, and then screw in place.
Before starting any drilling, cover over track
and operator head to protect them from drilling dust.
Mark fixing points on the ceiling, drill 10 mm holes for
plugs and screw on support straps.
If the toothed belt or chain appear to be too slack,
slight retensioning may be required. It may be
necessary to take up the slack by adjusting the
support straps.
In order to carry out further work, it may be necessary
to disconnect the operator from the door by pulling
the pull cord on carriage (4) and move the door
manually.
If the door is to be operated manually for a
longer period of time, then the locking pin must be
Fasteningthetracktooperatorhead
Fitting the connector attachment
Attaching the wall bracket
Slot track (as illustrated) with chain sprocket (2) onto
the operator shaft (1a) and screw down with the 4
self-tapping screws.
The enclosed door connector attachment is
suitable for all Novoferm up-and-over doors and
Novoferm ISO20 sectional doors.
Position door connector attachment (11) centrally on
the top edge of the door leaf.
Mark fixing holes and drill using 4 mm metal drill
(max. Drilling depth 10 mm) or use the existing drill
holes. Screw on attachment using enclosed self-
tapping screws 6.3 x 16 (4 - 6 screws up-and-over
door, 6 screws - ISO20).
For other sectional doors, use telescopic fitting
(17) (accessory).
In order to ensure that the door can run freely
underneath the track, distance x must be greater
than 20 mm. Choose distance x so that the angle of
the linking bar does not exceed 45° (see figure 11).
Mark the doors highest point of travel a plus
distance x on the lintel.
Hold wall fastening (10) at the total height (a+ x)
vertically over the door connector attachment drill,
drill holes for wall plugs and screw the wall bracket
onto the wall.
Place linking bar (12) between carriage (4) and the
door connector attachment (11) and connect at both
ends with the bolts. Provide bolts with security clips.
Attach security clips to bolts.
Suspendingtheboomfromtheceiling
Support straps
Note:
Connectingthedoorconnectorattachment
tothecarriage
Disengaging the carriage
Note:
4
5
5a
5b
6
7
8
9
10
11
12
InstallationInstructions
Please read these instructions carefully prior to
installation!
Preparing for installation
The following tools are required
Attention:
Supplypackage=completeset
Overview
Track
Installation should only be carried out by persons
qualified to do so!
Incorrect installation can put the safety of persons at
risk!
In case of improper installation, the manufacturers
guarantee becomes void.
1. In order to allow mains connection, a socket
must be available on site - the supplied mains
connecting cable has a length of 80 cm.
2. Check the stability of the door. Retighten the
screws and nuts on the door.
3. Check if the door is running smoothly. Lubricate
shafts and bearings. Check the petension of the
springs and if necessary re-adjust.
4. Establish the doors highest point of travel (see
figure 6).
5. Close the door and disable any existing locks
out of operation, if necessary dismantle.
Parts of latching devices, which could
form pinch or shear points, have to be
dismantled.
6. For garages without a second entrance, an
emergency release is required (accessory).
7. If a wicket pass door is included, fit the wicket
door contact.
8. Insert the light bulb into the operator and fasten
the lamp cover with 2 screws 4.2 x 50.
- Drilling machine with
10 mm masonry drill
4 mm metal drill
- Metal saw
- Spanner, sizes 10, 13 mm
- Slotted screwdriver, width 3 mm
- Phillips screwdriver, size 2 x 100
- Spirit level
Check the supplied screws and wall
plugs prior to use to ensure that these are suitable for
the strctural conditions on site.
Items 2 - 9 are pre-assembled
1. Operator head including LED-module
2. Driving pinion
3. Track, operator side
4. Carriage
5. Toothed belt or chain
6. Deflection roller
7. Connector
8. Track, door side
9. Tensioner
10. Wall bracket
11. Door connector attachment
12. Linking bar
13. Central support
14. Bag of screws
15. Hand transmitter
16. Support straps
17. Telescopic fitting for sectional doors
(accessory)
Remove the packaging and fold out the track to ist
0
1
2
3
removed from parking position (a) on the left and with
theopull cord in locking position (b).
In order to relock, return the locking pin into the
parking position (a) on the left and restore the
connection between the operator and the door. On
the next movement, the carriage automatically re-
engages.
connect
potential-free buttons and potential-free
relay outputs. Finally, replace the cover and
screw down.
Before using the operator for the first
time, it must be tested to make sure that it
is working properly and safely (see
section on Maintenance/Checks).
E. Connecting the aerial
F. Connection for external impulse generator
(accessory, e. g. key switch or digital coder) 13b
G.Input STOPA
Abreak at this input end causes the operator to
stop or prevents it from starting up.
Connection for wicket door contact 13c
(accessory)
H.Input STOPB
Abreak at this input end causes the operator to
automatically change direction during the closing
cycle.
Connection for 2-wire photocell EXTRA626 13d
(accessory).
Connection for optical closing edge safety device
OSE 13e (accessory).
I Voltage supply 24 V DC , max. 100 mA
Connection for 24V signal/traffic light 13f
(accessory).
Connection for external receiver 13g.
J. Plug-in base for radio receiver
K. Connection for external lighting (with earth) or
signal light (protection class II, max. 500W) 13h.
In case of increased need for personal safety, in
addition to the operators internal force limit, we
recommend installing a one-way photocell. Further
information on our range of accessories can be
found in our sales literature. Consult your specialist
dealer.
1. Pull out the mains plug and disconnect all existing
terminals.
2. Disconnect door and operator.Fix door.
3. Proceed according to points 3 to 13 of the
installaton Instructions but in reverse sequence.
Aligning the aerial / Connecting plan
Note:
Impulse generators and external safety devices
Dismantlingtheoperator
It is essential to pull out the mains plug
before opening the cover!
Do not connect any live leads, only
When using an external aerial, the shielding
must be assigned to the adjacent terminal (F, on
right) 13b.
O.LED-module
Warning sticker
Place the sticker clearly visible on the inner surface
of the door.
13
15


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Novoferm Novomatic 413 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Novoferm Novomatic 413 in the language / languages: English, German, Dutch, French, Spanish as an attachment in your email.

The manual is 2,8 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info