710805
375
Zoom out
Zoom in
Previous page
1/416
Next page
Monitor the System
375
Insight Managed 8-Port Gigabit Ethernet Smart Cloud Switch with 2 SFP Fiber Ports
If you do not know the IP address of the switch, see Access the Switch on page 13.
The login window opens.
4. Enter the switch’s password in the password field.
The default password is password. If you added the switch to a network on the Insight
app before and you did not yet change the password through the local browser interface,
enter your Insight network password.
The System Information page displays.
5. Select Monitoring > Ports > EAP Statistics.
The EAP Statistics page displays.
6. To refresh the page with the latest information about the switch, click the Refresh button.
7. To clear the counters for a specific port, select the check box associated with the port and
click the Clear button.
8. To clear all the EAP counters for all ports on the switch, select the check box in the row
heading and click the Clear button.
Clicking the button resets all statistics for all ports to default values.
The following table describes the EAP statistics displayed on the page.
Table 88. EAP statistics
Field Description
Ports The port number for which the EAP statistics are displayed.
EAPOL Frames Received The number of received valid EAPoL frames of any type.
EAPOL Frames Transmitted The number of transmitted EAPoL frames of any type.
EAPOL Start Frames
Received
The number of received EAPoL start frames.
EAPOL Logoff Frames
Received
The number of received EAPoL logoff frames.
EAPOL Last Frame Version The protocol version number carried in the most recently received EAPoL
frame.
EAPOL Last Frame Source The source MAC address carried in the most recently received EAPoL
frame.
EAPOL Invalid Frames
Received
The number of received EAPoL frames in which the frame type was not
recognized.
EAPOL Length Error Frames
Received
The number of received EAPoL frames in which the frame type was not
recognized.
EAP Response/ID Frames
Received
The number of received EAP response/identity frames.
EAP Response Frames
Received
The number of received valid EAP response frames (other than resp/ID
frames).
375


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Netgear GC110 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Netgear GC110 in the language / languages: English as an attachment in your email.

The manual is 1,84 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info