To provide the stove with fuel at the correct pressure it will be necessary to have the tank outlet at the maximum
3 meters (118 inches) above the stove’s metering valve top. The hightest fuel level must never be allowed to
exceed 3 meters above the valve top. If these limits cannot be achieved a secondary reservoir with a lift pump or
level control valve must be fitted. You will need to refer to the relevant building regulations and local bye-laws
for any restrictions on tank position relative to buildings and boundaries together with the provision of barrier
walls that may exist in your area.
Whatever type of tank you fit it must be equipped with two outlets, one to supply the stove and one at the
opposite end through which to drain off any accumulation of dirt or condensate from the tank. To facilitate this
the tank must be mounted to allow a fall, away from the stove outlet end and towards the drain, of 0.8 inches for
every 1 meter of tank length.
If a metal tank is installed it may be supported on brick piers insulated from the tank with a waterproof
membrane. A polyethylene tank must be supported over its entire base area.
Do not underestimate the weight of a full oil tank, it is heavy and must be supported with adequate foundations
and plinth. All cemented support must be allowed sufficient time to cure before fitting the tank.
Tank Fittings and Pipework
An isolating valve must be fitted directly to the tank outlet, allowing for the maintenance of the other
components in the pipeline. These components should include a metal bowl oil filter mounted to allow adequate
room for the removal of the sediment bowl and filter element without difficulty. The filter element should be
cleaned or replaced at least annually. We do not advise the fitting of plastic bowl oil filters as we consider them
too fragile for outdoor, unprotected situations.
Whilst the pipework from the tank to the stove may be in either steel or copper, the fitting of steel pipe
necessitates regular maintenance, therefore, the use of plastic covered copper pipe is recommended because it is
easily installed and virtually maintenance free. The use of galvanised steel pipe is prohibited because zinc reacts
with the fuel.
Where it is possible it may be desirable to bury the pipe, and whilst this is perfectly acceptable it must be done
with the utmost attention to the protection of the pipe from damage, both during the installation and throughout
its life, as it will not be possible to make inspections for leaks after installation.
Before the pipeline enters the building a fire valve should be fitted which will cut off atomatically the oil supply in
the unlikely event of the stove overheating. This valve is controlled by a remote sensing element situated within
or near the stove and above the metering valve. Finally, another manual isolation valve should be positioned as
close to the stove as possible to enable all supply to be turned off for stove maintenance.
It is possible to bury oil tanks, install them in house cellars and end oil pipework over a tortuous route of many
hundreds of yards, but any oil installation other than the most simple should be attempted only by suitably
qualified and experienced personnel, with the written approval of your insurance company.
55


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Nestor Martin H11 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Nestor Martin H11 in the language / languages: English, Dutch, French as an attachment in your email.

The manual is 4.75 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info