744399
19
Zoom out
Zoom in
Previous page
1/21
Next page
36
37
DK ENG
4.0 HETAS amendments
Health and safety precautions
Special care must be taken when installing the stove such that the requirements of the Health
and Safety at Work Act are met.
Handling
Adequate facilities must be available for loading, unloading and site handling.
Fire Cement
Some types of re cement are caustic and should not be allowed to come into contact with
the skin. In case of contact wash immediately with plenty of water.
Asbestos
This stove contains no asbestos. If there is a possibility of disturbing any asbestos in the course
of installation then please seek specialist guidance and use appropriate protective equipment.
Metal Parts
When installing or servicing this stove care should be taken to avoid the possibility of per-
sonal injury.
Note of references to the current UK regulations
In all cases the installation must comply with current Building Regulations, Local Authority
Byelaws and other specications or regulations as they aect the installation of the stove.
It should be noted that the Building Regulations requirements may be met by adopting the
relevant recommendations given in British Standards BS 8303, BS EN 15287-1:2007 as an
alternative means to achieve an equivalent level of performance to that obtained following
the guidance given in Approved Document J.
Please note that it is a legal requirement under England and Wales Building Regulations that
the installation of the stove is either carried out under Local Authority Building Control ap-
proval or is installed by a Competent Person registered with a Government approved Com-
petent Persons Scheme. HETAS Ltd operate such a Scheme and a listing of their Registered
Competent Persons can be found on their website at www.hetas.co.uk.
This stove must not be installed into a chimney that serves any other heating appliance.
More detailed advice about existing chimney usage
NOTE: A chimney height of not less than 4.5 metres measured vertically from the outlet of
the stove to the top of the chimney should be satisfactory. Alternatively the calculation proce-
dure given in EN 13384-1 may be used as the basis for deciding whether a particular chimney
design will provide sucient draught.
The outlet from the chimney should be above the roof of the building in accordance with
the provisions of Building Regulations Approved Document J.
If installation is into an existing chimney then it must be sound and have no cracks or other
faults which might allow fumes into the house. Older properties, especially, may have chim-
ney faults or the cross section may be too large i.e. more than 230 mm x 230 mm. Remedial
action should be taken, if required, seeking expert advice, if necessary. If it is found neces-
sary to line the chimney then a ue liner suitable for solid fuel must be used in accordance
with Building Regulations Approved Document J.
Any existing chimney must be clear of obstruction and have been swept clean immediately
before installation of the stove. If the stove is tted in place of an open re then the chimney
should be swept one month after installation to clear any soot falls which may have occurred
due to the dierence in combustion between the stove and the open re.
If there is no existing chimney then any new system must be to the designation described
above and in accordance with Building Regulations Approved Document J.
A single wall metal uepipe is suitable for connecting the stove to the chimney but is not
suitable for use as the complete chimney. The chimney and connecting uepipe must have
a minimum diameter of 150 mm and its dimension should be not less than the size of the
outlet socket of the stove.
Any bend in the chimney or connecting uepipe should not exceed 45°. 90° bends should
not be used.
Combustible material should not be located where the heat dissipating through the walls of re-
places or ues could ignite it. Therefore when installing the stove in the presence of combustible
materials due account must be taken of the guidance on the separation of combustible material
given in Building Regulations Approved Document J and also in these stove instructions.
If it is found that there is excessive draught in the chimney then a draught stabiliser should be
tted. Fitting of a draught stabiliser will aect the requirement for the permanent air supply
into the room in which the stove is tted in accordance with Approved Document J (see also
combustion air supply).
Commissioning and handover
Ensure all parts are tted in accordance with the instructions.
On completion of the installation allow a suitable period of time for any re cement and mor-
tar to dry out, before lighting the stove. Once the stove is under re check all seals for sound-
ness and check that the ue is functioning correctly and that all products of combustion are
vented safely to atmosphere via the chimney terminal.
On completion of the installation and commissioning ensure that the operating instructions
for the stove are left with the customer. Ensure to advise the customer on the correct use
of the appliance and warn them to use only the recommended fuel for the stove.
Advise the user what to do should smoke or fumes be emitted from the stove. The customer
should be warned to use a reguard to BS 8423:2002 (Replaces BS 6539) in the presence of
children, aged and/or inrm persons.
Warning note on fume emission
Properly installed, operated and maintained this appliance will not emit fumes into the dwelling.
Occasional fumes from de-ashing and re-fuelling may occur. However, persistent fume emis-
sion is potentially dangerous and must not be tolerated. If fume emission does persist, the fol-
lowing immediate actions should be taken:
A. Open doors and windows to ventilate room.
B. Let the re out or eject and safely dispose of fuel from the appliance.
C. Check for ue or chimney blockage, and clean if required.
Do not attempt to relight the re until the cause of the fume emission has been identied
and corrected. If necessary seek expert advice.
19


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Morso 6192 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Morso 6192 in the language / languages: English, Danish as an attachment in your email.

The manual is 0,42 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Morso 6192

Morso 6192 Usermanual and installation guide - German - 20 pages

Morso 6192 Usermanual and installation guide - Dutch, French - 36 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info