646338
18
Zoom out
Zoom in
Previous page
1/37
Next page
18
A sealed system must only be filled by a competent person using an approved filling
loop connected between the mains water supply pipe and the central heating return
pipe. Once filled the loop should be disconnected and left adjacent to the boiler.
Antifreeze/Inhibitor
The sealed CH circuit should, at all times be filled with the correct concentration of a
suitable antifreeze/inhibitor. Marco recommend Fernox Alphi
11
at a concentration
of
at least 25%. This will provide protection
on
the CH CIRCUIT ONLY down to
-11
deg Celsius and sufficient protection from corrosion.
Expansion Vessel
The following table gives the maximum system volume that the integral 7 litre
expansion vessel can sustain.
Vessel charge/initial
system
pressure
(bar)
0.5 1 1.5
Total
water
content
of
CH
system
(litres)
83
64
44
If the total water content exceeds that shown, an additional expansion vessel must
be fitted and connected to the heating system primary return pipe as close as
possible to the appliance. If an extra vessel is required, ensure that the total
capacity
of
both vessels is adequate. If the pressure display on the boiler control
panel indicates 2.2 bar
or
greater when the appliance is at maximum temperature
with all radiators
in
circulation an extra expansion vessel is required.
Pressure Relief Valve
A pressure relief valve set 3 bar (43.5psi)
is
fitted and a discharge pipe
is
routed to the
outside
of
the appliance. This discharge pipe should be extended to terminate safely
away from the appliance to a point where a discharge would not cause damage to
persons or property but would
be
detected. The pipe should
be
able to withstand
boiling water, be a minimum
of
15mm
in
diameter, and not include any upward pipe
runs or horizontal runs prone to freezing.
4.7
DOMESTIC
WATER
SYSTEM
Check that mains supply pressure is within the prescribed range
of
0.2 - 1
Obar.
If it
exceeds this limit, a pressure reducing valve should be fitted to the mains supply
before the inlet connection.
The final 1 000 mm
of
the mains supply pipe to the boiler and the hot water outlet
must be
in
15mm copper.
18


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Morco 24CPM at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Morco 24CPM in the language / languages: English as an attachment in your email.

The manual is 7,72 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info