INDOOR UNIT INSTALLATION
INSTALL THE MAIN BODYINSTALL THE MAIN BODY
Adjust the indoor unit and the ceiling hole with Installation Model Paper applied. Fix the Model Paper on
the main body of the air conditioner with five screws (M4 16) applied.
1. Installing f10 hanging screw bolt. (4 bolts)
Please refer to the following figure for the distance measurement between the screw bolts.
Please install with f10 hanging screw bolts.
The handling to the ceiling varies from he constructions, consult the construction
personnels for the specific procedures.
1) The size of the ceiling to be handled----do keep the ceiling flat. Consolidate the roof
&&
NEW CONCRETE BRICKS
Inlaying or embedding the screw bolts.
(Refer to Chart 3)
(Blade shape
insertion)
(Slide insertion)
Steel bar
Embedding screw bolt
(Pipe hanging and embedding
screw bolt)
Chart 3
FOR ORIGINAL CONCRETE BRICKS
Use emkecloled screw bold, crock and
stick harnoss. (Refer to Chart 4)
Chart 4
STEEL ROOF BEAM STRUCTRE
Install and use directly the supporting
angle steel. (Refer to Chart 5)
Chart 5
Hanging screw bolt
Hanging bolts
Supporting angle steel
&&
&&
&&
&&
beam for possible vibration.
2) Cut off the roof beam.
3) Strengthen the place cut off, and consolidate the roof beam.
Connect lines and pipes inside the ceiling after the air conditioner is hanged.
Carry out the pipe and line operation in the ceiling after finishing the installation of the main body.
While choosing where to start the operation, determine the direction of the pipes to be drawn out.
Especially in case there is a ceiling, position the refrigerant pipes, drain pipes, indoor & outdoor lines
to the connection places before hanging up the machine.
The installation of hanging screw bolts.
Timber over the beam
Roof beam
Ceiling
Hanging screw bolts
Chart 2
WOODEN CONSTRUCTION
Put the square timber traversely over the
roof beam, then install the hanging screw
bolts. (Refer to Chart 2)
4. CAUTION
The drain pipe of indoor unit must be heat insulated, or it will condense dew, as well as the
connections of the indoor unit.
Hard PVC binder must be used for pipe connection, and make sure there is no leakage.
With the connection part to the indoor unit, please be noted not to impose pressure on the side of
indoor unit pipes.
When the declivity of the drain pipe downwards is over 1/100, there should not be any winding,
The total length of the drain pipe when pulled out traversely shall not exceed 20m, when the pipe is
over long, a prop stand must be installed to prevent winding.
Refer to the following figures the installation of the pipes.
As long as possible (10cm)
Lean Downward
over 1/100
VP30
DRAINAGE TESTDRAINAGE TEST
Do the following before Power construction work is done:
Remove Water Level Switch Connecting Pole (2p), connect 220V power to L and N on the Terminal
board. Check it.
Remove the test cover, and pour in 500cc water to the water receiver through a stow tube.
Water Container
Chart 39
After Power construction work is done, do drainage test when the air conditioner is in cooling
operation.
Take special notice of pump sound. (The drainage is normal if the sound changes from continuum to
discontinuum.)
Water Level Switch Connector (red)
Electrical Control Box
Chart 40
Insert Water Level Switch Connecting Pole. Now the drainage test is done.
14
3
1.5m~2m
Supporting Unit
Lean Downward over 1/100
Chart 36
Bend
Fold
Chart 37
Chart 38
5


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Midea MCB09HRN2 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Midea MCB09HRN2 in the language / languages: English as an attachment in your email.

The manual is 0,93 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Midea MCB09HRN2

Midea MCB09HRN2 User Manual - English - 22 pages

Midea MCB09HRN2 Installation Guide - Dutch - 5 pages

Midea MCB09HRN2 User Manual - Dutch - 9 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info