776312
13
Zoom out
Zoom in
Previous page
1/74
Next page
MI 3109 EurotestPV Lite Instrument description
13
3.2 Connector panel
Figure 3.2: Connector panel
Legend:
1 Test connector Measuring inputs / outputs
2 Charger socket
3 USB connector Communication with PC USB (1.1) port.
4 Protection cover
5 C1 Current clamp measuring input #1
6 P/C2 Current clamp measuring input #2
Measuring input for external probes
7 PS/2 connector
Communication with PC serial port
Connection to optional measuring adapters
Connection to barcode / RFID reader
Connection to Bluetooth dongle
Warnings!
Maximum allowed voltage between any test terminal and ground is 550 V a.c.
or 1000 V d.c.!
Maximum allowed voltage between test terminals on test connector is 600 V
a.c. or 1000 V d.c.!
Maximum allowed voltage between test terminals P/C2, C1 is 3 V!
Maximum short-term voltage of external power supply adapter is 14 V!
13


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Metrel MI 3109 - Eurotest PV Lite at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Metrel MI 3109 - Eurotest PV Lite in the language / languages: English as an attachment in your email.

The manual is 1.66 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Metrel MI 3109 - Eurotest PV Lite

Metrel MI 3109 - Eurotest PV Lite Quick start guide - Dutch - 68 pages

Metrel MI 3109 - Eurotest PV Lite User Manual - Dutch - 68 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info