MI 3108 EurotestPV Safety and operational considerations
9
Continuity measurements should only be performed on de-energized objects!
Parallel loops may influence on test results.
Testing PE terminal
If phase voltage is detected on the tested PE terminal, stop all measurements
immediately and ensure the cause of the fault is eliminated before proceeding
with any activity!
Notes related to measurement functions:
General
The indicator means that the selected measurement cannot be performed
because of irregular conditions on input terminals.
Insulation resistance, continuity functions and earth resistance measurements
can only be performed on de-energized objects.
PASS / FAIL indication is enabled when limit is set. Apply appropriate limit value
for evaluation of measurement results.
In the case that only two of the three wires are connected to the electrical
installation under test, only voltage indication between these two wires is valid.
Insulation resistance, Insulation resistance of PV systems
Insulation resistance:
If a voltage of higher than 30 V (AC or DC) is detected between test terminals,
the insulation resistance measurement will not be performed.
Insulation resistance of PV systems:
Different pre-tests are carried out. If conditions are proper and safe the
measurement will be be continued.
Otherwise or or message is displayed.
The instrument automatically discharge tested object after finished
measurement.
A double click of TEST key starts a continuous measurement.
Continuity functions
If a voltage of higher than 10 V (AC or DC) is detected between test terminals,
the continuity resistance test will not be performed.
Compensate test lead resistance before performing a continuity measurement,
where necessary.
RCD functions
Parameters set in one function are also kept for other RCD functions!
The measurement of contact voltage does not normally trip an RCD. However,
the trip limit of the RCD may be exceeded as a result of leakage current flowing
to the PE protective conductor or a capacitive connection between L and PE
conductors.
The RCD trip-lock sub-function (function selector switch in LOOP position) takes
longer to complete but offers much better accuracy of fault loop resistance (in
comparison to the RL sub-result in Contact voltage function).
9


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Metrel MI 3108 - Eurotest PV at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Metrel MI 3108 - Eurotest PV in the language / languages: English as an attachment in your email.

The manual is 3.81 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Metrel MI 3108 - Eurotest PV

Metrel MI 3108 - Eurotest PV User Manual - German - 136 pages

Metrel MI 3108 - Eurotest PV User Manual - Dutch - 62 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info