643408
34
Zoom out
Zoom in
Previous page
1/64
Next page
32
5-INSTALLATION AND ASSEMBLY
SETTING UP THE CLADDING
All product functionalities must be tested before being clad. The company cannot be held liable for any damage to the
cladding should operating anomalies arise, which were not ascertained before the cladding was applied to the product.
IT IS OBLIGATORY to check seal of all piping the smoke goes through (smoke tting, gaskets and insert in the ue) before
installing the cladding.
READ THE “OPERATION TEST” CHAPTER BEFORE STARTING ANY PRODUCT CLADDING OPERATION.
The product and parts of the cladding must be fastened to each other WITHOUT COMING IN CONTACT WIT THE STEEL STRUCTURE to
avoid transmitting heat to the marble and/or stone and to allow for normal thermal dilation; pay attention to wood nishes like beams
or shelves.
It is recommended to construct the counter-hood in re-retardant plasterboard, 15 to 20 mm thick with self-supported galvanized prole
frame in order not to bear on the cladding components (wooden beams or marble architraves) which do not have a load bearing structure
and to be able to operate easily in the event of faults and/or future maintenance. Dry-assemble the hearth of the cladding
leaving a 1 cm gap between insert and hearth to perform insulation.
WOODEN BEAM INSULATION
If you wish to mount a wooden beam, it must be protected with adequate insulation from hot parts in order to prevent the risk of re or
damage to the cladding.
INSTALLATION OF STANDARD CLADDING
The use and installation manual found in each specic cladding must be referred to for setting up product specic claddings.
FIGURE 8 - BEAM INSULATION
1. APPLIED INSULATING AGENT OR TO BE
APPLIED
2. WOODEN BEAM
3. MARBLE OR OTHER MATERIAL
34


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for MCZ Vivo 90 Pellet Comfort Air at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of MCZ Vivo 90 Pellet Comfort Air in the language / languages: English as an attachment in your email.

The manual is 5,82 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of MCZ Vivo 90 Pellet Comfort Air

MCZ Vivo 90 Pellet Comfort Air Usermanual and installation guide - Dutch - 64 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info