643410
33
Zoom out
Zoom in
Previous page
1/74
Next page
31
5-PRECAUTIONS BEFORE START-UP
Technical Dept. - All rights reserved - Reproduction is prohibited
It is good practice to guarantee eective ventilation in the room during the initial start-up, as the product will emit
some smoke and smell of paint.
Do not stand close to the product and air the room. The smoke and smell of paint will disappear after about an hour of operation, however,
remember they are not harmful in any case.
The stove will be subject to expansion and contraction during the start-up and cooling phases, therefore light creaking noises may be
heard.
This is absolutely normal as the structure is made of laminated steel and must not be considered a defect.
Make sure the plumbing system is sealed perfectly and that there are no leaks or pressure drops.
Make sure that all cut-o valves between the product and the system are open.
Make sure you have bled all air out of the system before start-up.
Make sure that internal devices work properly (ow switches, thermostats, etc.). Make sure that the combustion chamber and the chimney
are clean, and that the plumbing circuit is free of obstructions.
The basic settings ensure proper operation and prevent overheating during the rst ignitions.
SETTINGS TO BE CARRIED OUT BEFORE THE INITIAL START-UP
SWITCHING ON/OFF
Once the power cable is connected in the rear part of the product, bring the switch, which is in the pellets loading door, to position (I). The
illuminated pushbutton switch will turn on.
The product remains switched o and the panel shows a rst screen displaying OFF, by pressing any button a screen displaying MENU will
appear.
The product is switched on and o by pressing key B on the control panel for 2 seconds.
After a start-up phase that lasts approximately 15 minutes, the product starts to work in steady-state conditions.
After switching o the product by pressing key B on the control panel, the cooling stage begins, which involves interruption of fuel
loading, brazier cleaning and ventilation until the product is suciently cool.
FEED SCREW LOADING
This function can only be activated when the product is o and allows the pellets to be loaded into the loading system (feed screw). It
can be used each time it runs out of pellets in the hopper (see alarm A02). It is useful to prevent failed start-ups (alarm A01) due to the
hopper being empty.
To activate the FEED SCREW LOADING function, with the product switched o, from the control panel enter the SETTINGS entry, select
FEED SCREW LOADING and ON. When the pellets start falling into the brazier deactivate FEED SCREW LOADING and switch on the product
CONNECT THE POWER
CABLE
I/O SWITCH
33


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for MCZ Vivo 80 Pellet Hydro at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of MCZ Vivo 80 Pellet Hydro in the language / languages: English as an attachment in your email.

The manual is 12,73 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of MCZ Vivo 80 Pellet Hydro

MCZ Vivo 80 Pellet Hydro Usermanual and installation guide - Dutch - 64 pages

MCZ Vivo 80 Pellet Hydro Usermanual and installation guide - French - 64 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info