643410
30
Zoom out
Zoom in
Previous page
1/74
Next page
765
610
28
4-INSTALLATION AND ASSEMBLY
PRODUCT INLET HOLE
The hole to be made in the wall must be 765*610 mm. These measurements allow the frame to cover the gap that remains between the
product and the hole and also allow the product to be removed if maintenance is to be performed and/or parts are to be replaced.
SWITCH AND CONTROL PANEL CONNECTION
The emergency panel and switch are already tted on the pellets loading door and are already connected to the relative cables by the
manufacturer. Take the switch cable and connect it to the socket on the rear of the product.
The control panel must instead be connected to the circuit board in position 1.
Pay utmost attention when handling panels connected to the relative cables.
Cables must stay in areas away from heat or in areas where they cannot be damaged in the event of extracting
the product.
For proper operation make the at cable and the switch cable pass far from each other, with dierent paths.
Do not force insertion of the connector under any circumstances.
Do not fold and/or twist the cables.
Do not modify the connectors or cabling or panel supports.
DOOR ASSEMBLY
Once the electrical cabling is complete, before xing the hood door permanently, carry out an operation test.
If the test has a positive outcome, x the door to the hood with four screws, using the four holes present on the door frame and indi-
cated with the letter (B).
The holes indicated on the horizontal proles of the door (A) are instead for xing the door frame to the chute frame to permanently
fasten the two elements, enclosing the hood wall in the middle.
One must preventively make a rectangular hole in the hood at a height determined by how the optional support has been installed or by
how the brickwork platform has been constructed.
30


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for MCZ Vivo 80 Pellet Hydro at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of MCZ Vivo 80 Pellet Hydro in the language / languages: English as an attachment in your email.

The manual is 12,73 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of MCZ Vivo 80 Pellet Hydro

MCZ Vivo 80 Pellet Hydro Usermanual and installation guide - Dutch - 64 pages

MCZ Vivo 80 Pellet Hydro Usermanual and installation guide - French - 64 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info