812469
4
Zoom out
Zoom in
Previous page
1/36
Next page
4
13-FIRST START-UP
During the disposal phase of the residual heat, the fans operate at about 80% of their output and the speed cannot be varied. This is
determined by the need for all the accumulated heat to be evacuated safely and quickly. The switch-o phase can last 15 - 30 minutes
depending on the heat stored in the structure, determined by the duration and the operating regime of the product throughout the day.
When the internal temperature drops below the set thresholds, the fans for hot air and exhaust fume extraction will automatically switch
o.
POWER SUPPLY
When start-up is complete, the panel will display ON with a constant ame at level 3 . The modulation of the ame for higher or
lower power is then controlled autonomously on the basis of reaching the set temperature.
(see also “OPERATING MODE” - “Set Flame”)
If the ame fails to ignite, despite a regular ow of pellets, check that the brazier is seated correctly: it must rest snugly against the
interlocking slot and be clean of any ash incrustations. If no anomaly is found during this inspection, there may be a problem with
the product components or installation may not be correct.
REMOVE THE PELLETS FROM THE BRAZIER AND CONTACT AN AUTHORISED TECHNICIAN.
Please ensure the brazier is free from ALL pellets and ash build up following any failed ignitions. Failure to clear
out the brazier prior to resetting may result in further failed ignitions or in certain conditions an explosive ignition.
It is good practice to ensure eective ventilation in the room during the initial start-up, as the product will emit
some smoke and smell of paint.
Do not stand close to the boiler and ventilate the room as described. The smell of paint will disappear after about an hour of operation,
however, it is not harmful in any case.
The product will be subject to expansion and contraction during the start-up and cooling phases, therefore slight creaking noises may
be heard.
This is absolutely normal as the structure is made of laminated steel and must not be considered a defect.
DO NOT EXPECT HEATING EFFICIENCY IMMEDIATELY!!! THE PRODUCT NEEDS SOME RUNNING-IN TIME.
It is extremely important to make sure the product does not reach high temperatures straight away, but to increase the temperature
gradually using low power at rst.
This will prevent damage to the welds and the steel structure.
Do not touch the product during the rst lighting, as it is during this phase that the paint sets. If you touch the paint,
you may expose the steel surface.
If necessary, touch up the paint with the spray can of the specic colour.
4


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for MCZ TEIA COMFORT AIR 10 UP S2 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of MCZ TEIA COMFORT AIR 10 UP S2 in the language / languages: English as an attachment in your email.

The manual is 3.89 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of MCZ TEIA COMFORT AIR 10 UP S2

MCZ TEIA COMFORT AIR 10 UP S2 Installation Guide - English - 44 pages

MCZ TEIA COMFORT AIR 10 UP S2 User Manual - German - 44 pages

MCZ TEIA COMFORT AIR 10 UP S2 User Manual - German - 36 pages

MCZ TEIA COMFORT AIR 10 UP S2 Installation Guide - Dutch - 44 pages

MCZ TEIA COMFORT AIR 10 UP S2 User Manual - Dutch - 36 pages

MCZ TEIA COMFORT AIR 10 UP S2 Installation Guide - French - 48 pages

MCZ TEIA COMFORT AIR 10 UP S2 User Manual - French - 36 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info