694209
2
Zoom out
Zoom in
Previous page
1/76
Next page
PELLET STOVES Chapter 1
INSTALLATION AND USE MANUAL
page 2
Introduction Technical service - Rights reserved MCZ GROUP S.p.A. - Reproduction prohibited
INTRODUCTION .................................................................................................................................... 4
1. WARNINGS AND GUARANTEE CONDITIONS ..................................................................................... 5
1.1. SAFETY INSTRUCTIONS .................................................................................................................. 5
1.2. OPERATING WARNINGS .................................................................................................................. 6
1.3. WARNINGS FOR THE CORRECT DISPOSAL OF THE PRODUCT ............................................................ 7
1.4. GUARANTEE CONDITIONS .............................................................................................................. 7
1.4.1. Limitations ............................................................................................................................... 7
1.4.2. Exclusions ................................................................................................................................ 8
2. THEORETICAL NOTIONS FOR INSTALLATION .................................................................................. 9
2.1. Pellets ............................................................................................................................................ 9
2.2. PRECAUTIONS FOR INSTALLATION ................................................................................................ 10
2.3. OPERATING AREA ......................................................................................................................... 11
2.4. CONNECTION TO THE EXTERNAL AIR INTAKE ................................................................................ 11
2.5. CONNECTION OF SMOKE DISCHARGE PIPE .................................................................................... 12
2.6. CONNECTION TO THE FLUE PIPE ................................................................................................... 13
2.7. CONNECTION TO AN EXTERNAL FLUE WITH INSULATED OR DOUBLE-WALL PIPE ............................. 13
2.8. CONNECTION TO THE FLUE PIPE ................................................................................................... 13
2.9. OPERATING PROBLEMS CAUSED BY DRAUGHT DEFECTS IN THE FLUE ............................................. 14
2.10. PLUMBING CONNECTION ........................................................................................................... 15
3. INSTALLATION AND ASSEMBLY ...................................................................................................... 16
3.1. DRAWINGS AND TECHNICAL CHARACTERISTICS ............................................................................ 16
3.1.1. EGO HYDRO Dimensions ......................................................................................................... 16
3.1.2. STAR HYDRO Dimensions ....................................................................................................... 16
3.1.3. Dimensions of the HYDRO 15-22 version CLUB without domestic hot water production kit ............ 17
3.1.4. Dimensions of the HYDRO 22 version CLUB equipped with kit for domestic hot water production. . 17
3.1.5. Dimensions of the HYDRO 15-22 version SUITE without domestic hot water production kit .......... 18
3.1.6. Dimensions of the HYDRO 22 version SUITE equipped with kit for domestic hot water production. 18
3.1.7. Dimensions of the HYDRO 15-22 version MUSA without domestic hot water production kit ........... 19
3.1.8. Dimensions of the HYDRO 22 version MUSA equipped with kit for domestic hot water production. 19
3.1.9. Technical characteristics ......................................................................................................... 20
3.2. PREPARATION AND UNPACK ING ................................................................................................... 23
3.3. LATERAL CLADDING ASSEMBLY ..................................................................................................... 26
3.3.1. Assembly of profiles for inserting the steel sides-EGO ................................................................ 26
3.3.2. Assembly of profiles for inserting the ceramic and soapstone sides-STAR .................................... 27
3.3.3. Assembly of the lower panel – Suite and Club Stoves ................................................................ 28
3.3.4. Installation of side tiles - Suite and Club Stoves ........................................................................ 29
3.3.5. Installation of ceramic top - Suite and Club Stoves .................................................................... 29
3.3.6. Assembly of sides on the MUSA stove ...................................................................................... 30
3.4. PLUMBING SYSTEM CONNECTION ................................................................................................. 31
3.4.1. Connections to the system ...................................................................................................... 33
3.4.2. System filling ......................................................................................................................... 34
3.4.3. Water characteristics .............................................................................................................. 34
3.5. KIT FOR DOMESTIC HOT WATER PRODUCTION (Optional) Only for Suite/Club/Musa stoves ............... 35
3.6. EXAMPLE INSTALLATION DIAGRAMS ............................................................................................. 36
3.6.1. Installation diagram for heating system without domestic hot water kit
(EGO/STAR/SUITE/CLUB/MUSA) ........................................................................................................... 36
3.6.2. Installation diagram for heating system with domestic hot water kit (SUITE/CLUB/MUSA) ............ 37
3.6.3. Heating installation diagram in combination with a boiler ........................................................... 38
3.6.4. Heating installation in combination with a storage tank .............................................................. 38
3.7. INSTALLATION OF AIR FILTER ...................................................................................................... 39
3.8. OPENING/CLOSING THE DOOR ...................................................................................................... 39
3.9. MAKING THE ELECTRICAL CONNECTIONS ...................................................................................... 39
4. OPERATION ..................................................................................................................................... 40
Downloaded from www.Manualslib.com manuals search engine
2


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for MCZ Suite Hydro at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of MCZ Suite Hydro in the language / languages: English as an attachment in your email.

The manual is 5,37 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of MCZ Suite Hydro

MCZ Suite Hydro Usermanual and installation guide - German - 72 pages

MCZ Suite Hydro Usermanual and installation guide - Dutch - 76 pages

MCZ Suite Hydro Usermanual and installation guide - French - 76 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info