PELLET STOVES Chapter 3
INSTALLATION AND USE MANUAL
page 22
Installation and assembly Technical service - Rights reserved MCZ Group S.p.A. - Reproduction prohibited
3.2. PREPARATION AND UNPACK ING
Suite, Club and NIMA stoves are delivered in two packages:
The first contains the stove
The second contains the ceramic cladding. (Fig. 2)
The Musa stove is only delivered in one set of packaging composed of:
The first pack contains the stove
The second pack contains the sides made of steel (fig.1).
The Toba stove is delivered in two ways depending on its front panel,
both ceramic or steatite.
In the case of a ceramic front panel there will be one sole package with
the structure (the box with the ceramic panel shall come flanked with
that containing the structure and the top) while in the case of a steatite
front panel the package shall be formed of two pallets, one with the
structure and the top and the other made in steatite.
The Sagar stove is delivered in one sole package formed of:
The first containing the stove with the box holding the steel
sides to its side
One contains the ceramics or steatite for the top (fig.2/2a). In
this case there will be a single pack for the structure (the
cardboard with the ceramics will be placed above the packaging
with the structure)
Open the packaging, remove, for the Suite/
Club/Sagar/Toba/Nima, stoves, the two brackets that block the
stove on the pallet (one on the right and one on the left side-fig.3/4),
while for the Musa (fig.5) stove remove the screws directly from the
base of the stove.
Position the stove in the chosen place, paying attention that it meets
the instructions above.
Figure 1 – Example of stove packaging
Figure 3 - Removing the packaging screws
(in figure Suite stove)
Figure 2 - Example of packing for
ceramics
Figure 2a – Soapstone package example
(Toba Oven)