812501
64
Zoom out
Zoom in
Previous page
1/72
Next page
64
34-CLEANING
SHUTDOWN (end of season)
At the end of each season, before switching the product o, it is recommended to remove all the pellets from the hopper with a vacuum
cleaner with a long pipe.
We recommend removing the unused pellets from the hopper because they can retain moisture. Disconnect any combustion air ducting
that can lead to moisture inside the combustion chamber but, above all, ask the specialised technician to refresh the paint inside the
combustion chamber with the special silicone spray paints (available at any store or Technical Assistance Centre) during the necessary
annual end of season scheduled maintenance operations. This way the paint will protect the inner parts of the combustion chamber,
blocking any type of oxidative process.
When not in use the appliance must be disconnected from the mains power supply. It is recommended to remove the
power cable for additional safety, especially in the presence of children.
The service fuse may have to be replaced if the control panel display does not switch on when the product is switched on again by pressing
the main switch on its side.
There is a fusebox on the side of the product, near the power socket. Open the fusebox cover with a screwdriver and replace the fuses if
necessary (3.15 A delayed) - seek assistance from an authorised and qualied technician.
CHECKING THE INTERNAL COMPONENTS
ATTENTION!
The internal electromechanical components must only be checked by qualied personnel whose technical expertise
includes combustion and electricity.
We recommend for this yearly maintenance to be carried out (with a scheduled service contract). This operation consists of a visual and
functional inspection of the internal components. A summary of the checks and/or maintenance operations that are essential for the
correct operation of the product is provided below.
PARTS/FREQUENCY 1 DAY 23 DAYS 7 DAYS 15/20 DAYS 1 YEAR
UNDER THE USER'S
RESPONSIBILITY
Brazier
Ash collection compartment
Ash pan*
Glass
Air lter
BY THE QUALIFIED TECHNICIAN
Upper exchanger
Lower exchanger
Smoke duct
Gaskets
Door closure operation
* Emptying of the ash pan depends on various factors (pellet type, stove power, stove use, type of installation...); the exact emptying time
will be suggested by experience.
64


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for MCZ MUSA AIR 10 M2 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of MCZ MUSA AIR 10 M2 in the language / languages: English as an attachment in your email.

The manual is 11.72 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of MCZ MUSA AIR 10 M2

MCZ MUSA AIR 10 M2 Installation Guide - English - 68 pages

MCZ MUSA AIR 10 M2 User Manual - German - 72 pages

MCZ MUSA AIR 10 M2 Installation Guide - German - 68 pages

MCZ MUSA AIR 10 M2 User Manual - Dutch - 72 pages

MCZ MUSA AIR 10 M2 Installation Guide - Dutch - 68 pages

MCZ MUSA AIR 10 M2 User Manual - French - 72 pages

MCZ MUSA AIR 10 M2 Installation Guide - French - 76 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info